Back to search

University of Saskatchewan

EVENT-BASED CUSTOMER INTERRUPTION COST EVALUATION

Abstract

dc:description.abstract

Power supply failures can have serious monetary impacts on the system customers. In some jurisdictions in the new deregulated electric utility environment, system customers are receiving monetary compensation for electric supply failures. The compensation is usually related to the customer type and duration of the outage event. There is therefore increasing interest in assessing the customer costs associated with failures in electric power supply and the responsibilities associated with these failures. The main objective of this research is to evaluate customer interruption costs for specified failure events. Considerable work has been focused on the collection of data on the monetary impact of outages and the use of this information in system planning. This research work is focused on the development of a procedure to use existing data to estimate the monetary impacts of a specified failure on a practical distribution feeder. This thesis describes the development of an event-based customer interruption cost evaluation procedure and the associated software designated as the EBCost Program. The results obtained using the EBCost Program show that the actual customer interruption costs depend on many factors. The absence of many of the required data sets can make it difficult to estimate precise individual customer outage costs due to a specific failure event. This thesis examines the development of a series of approximate methods. The results obtained using these approximate methods are compared with a set of base case results obtained using the EBCost Program. The approximate approaches developed provide practical alternatives to the detailed EBCost method for evaluating the customer outage costs for a specific outage event on a specific distribution feeder. The developed concepts can also be used to estimate the costs associated with a widespread outage event, i.e. a whole city. The thesis also illustrates the utilization of the approximate event cost method to minimize the overall customer interruption costs due to load shedding actions under an emergency.

Degree

thesis:*
Name thesis:degree_name
Master of Science (M.Sc.)
Level thesis:degree_level
Masters
Department thesis:degree_department
Electrical Engineering
Grantor
University of Saskatchewan
Year dc:date.issued
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Wangdee, Wijarn
Advisor dc:contributor.advisor
  • Billington, Roy

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10388/16029

Chain of custody

source
Harvested from
University of Saskatchewan
Base URL
harvest.usask.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Wangdee, Wijarn. EVENT-BASED CUSTOMER INTERRUPTION COST EVALUATION. Masters thesis, University of Saskatchewan, 2003. https://hdl.handle.net/10388/16029