Back to search

University of Saskatchewan

TRANSMISSION SYSTEM EXPANSION PLANNING UNDER DEREGULATION

Abstract

dc:description.abstract

One of the main objectives of deregulation in electric power industry is to introduce competition in the generation sector. The introduction of competition in electric power market has made power flow control more complex and difficult than ever. The scarcity of transmission capacity and a continued demand for power from less expensive sources sometimes lead to transmission system congestion or overloading. Congestion relief through either generation reschedules or transmission system expansion becomes an economic issue on which the deregulated electric industry is showing an increasing interest. The research work described in this thesis examines issues related to transmission system expansion under deregulation, including transmission congestion, determination of optimal generation reschedules and selection of optimal transmission system expansion schemes. When congestion occurs in a deregulated power system, generation has to be rescheduled to ensure system security. This reschedule usually increases the operating cost. Two methods, named DC and AC method respectively, are proposed in this thesis to optimize the generation reschedule.

Degree

thesis:*
Name thesis:degree_name
Master of Science (M.Sc.)
Level thesis:degree_level
Masters
Department thesis:degree_department
Electrical Engineering
Grantor
University of Saskatchewan
Year dc:date.issued
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Zheng, Yong

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10388/16169

Chain of custody

source
Harvested from
University of Saskatchewan
Base URL
harvest.usask.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Zheng, Yong. TRANSMISSION SYSTEM EXPANSION PLANNING UNDER DEREGULATION. Masters thesis, University of Saskatchewan, 2003. https://hdl.handle.net/10388/16169