Back to search

University of Saskatchewan

Estimating Primary Consolidation Settlement in a Clay Till Foundation Below an Earthen Embankment

Abstract

dc:description.abstract

This study focused on predicting the time rate of consolidation and settlement magnitude of a clay till foundation beneath a large earthen embankment constructed in Brandon, southwest Manitoba. The stratigraphic profile at the site consists of an upper complex of sand, silt, and fill materials overlying a thick overconsolidated clay till unit and underlying clay shale. Soil samples collected from the clay till, along with in-situ Seismic Cone Penetrometer Testing (SCPTU) and Reaming Pressuremeter Testing (RPM) results, were provided for this research. Additionally, monitoring data collected during embankment construction, including surveyed embankment heights and Vibrating Wire Piezometer (VWP) data, were also provided for this research. To evaluate the hydraulic and consolidation characteristics of the clay till, incremental loading (IL) and constant rate of strain (CRS) consolidation tests were conducted at the University of Saskatchewan. Laboratory data were compared to the soil response measured in-situ, and material properties were selected based on both laboratory and in-situ test results. The material properties were then used to define the foundation soils in a finite element method (FEM) model, developed to simulate embankment construction and perform deformation analyses. The hydraulic conductivity of the clay till, as determined by laboratory and in-situ tests, was estimated to range from 1x10-10 m/s to 1x10-11 m/s. However, deformation analysis indicated that these values represent the matrix permeability of the clay till, as the model significantly overpredicted excess porewater pressure generated during embankment construction compared to VWP field data. By adjusting the hydraulic conductivity to 1x10-6 m/s for all till units, the model showed better agreement with field data. This suggests that groundwater flow at the site is controlled by the macro-structure hydraulic conductivity, which is likely governed by fractures within the clay till that developed due to stress changes from repeated glacial advances and retreats. Finally, a comparison was made between a linear elastic soil model, and a model incorporating nonlinear soil stiffness. The nonlinear deformation analysis aimed to improve settlement predictions by defining the entire nonlinear behaviour of the clay till foundation.

Degree

thesis:*
Name thesis:degree_name
Master of Science (M.Sc.)
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Civil Engineering
Department thesis:degree_department
Civil and Geological Engineering
Grantor
University of Saskatchewan
Year dc:date.issued
2025

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Cross, Nevin R
Committee members dc:contributor.committeemember
  • Fleming, Ian
  • Bartz, James
  • Elwood, David

Subjects

dc:subject × 17

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10388/17066

Chain of custody

source
Harvested from
University of Saskatchewan
Base URL
harvest.usask.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Cross, Nevin R. Estimating Primary Consolidation Settlement in a Clay Till Foundation Below an Earthen Embankment. Masters thesis, University of Saskatchewan, 2025. https://hdl.handle.net/10388/17066