Back to search

University of Saskatchewan

A Risk-Informed Framework for Identifying and Warehousing Critical Spare Parts for Primary Water Mains: A Case Study of the City of Saskatoon

Abstract

dc:description.abstract

Municipal water distribution systems depend on the timely availability of spare parts to support emergency maintenance and repair activities. For large-diameter primary water mains, critical components are often costly, procured from limited suppliers, and associated with long lead times, making inventory shortages during emergency failures a significant operational risk. Despite this challenge, many utilities continue to rely on reactive inventory practices rather than structured, risk-informed approaches. This research developed and applied an integrated framework for identifying and warehousing critical spare parts for the City of Saskatoon’s primary water main network. The framework consisted of two phases. The first phase assessed the risk of 1,321 primary water main segments using Likelihood of Failure (LOF) and Consequence of Failure (COF). LOF was determined using asset characteristics, including remaining useful life, failure history, proximity to power lines, and corrosion control conditions. Missing LOF values were estimated using a K-Nearest Neighbors algorithm. COF was quantified through hydraulic simulations in WaterCAD under Maximum Day Demand (MDD) conditions, evaluating network pressure impacts resulting from segment isolation. LOF and COF scores were combined to calculate segment-level risk values and classify all primary water mains into five risk categories ranging from low to high risk. The analysis identified significant variation in failure consequences across the network and established a basis for risk-based infrastructure prioritization. The second phase translated the risk assessment results into a practical warehousing strategy. Medium-to-high and high-risk segments were grouped into nine pipe categories based on material type and nominal diameter. An Analytic Hierarchy Process framework was initially developed to evaluate spare parts criticality using criteria related to procurement, storage, and maintenance considerations. However, consultation with City of Saskatoon engineers and experts demonstrated that evaluating individual components did not adequately reflect operational repair requirements. As a result, the methodology was refined to treat each pipe category as a single inventory unit, leading to the development of nine standardized repair kits containing all components required for emergency repairs. This research contributes to the spare parts management literature in two important ways. First, consequence of failure was quantified using physics-based hydraulic simulation rather than relying solely on expert judgment, providing a network-sensitive measure of failure impact. Second, the repair kit was established as the operational unit of inventory analysis, reflecting the requirement that all components of a repair assembly be available simultaneously for a repair to proceed. Together, these contributions provide a transparent, expert-validated, and operationally grounded framework that links infrastructure risk assessment with critical spare parts planning for large-diameter municipal water systems.

Degree

thesis:*
Name thesis:degree_name
Master of Science (M.Sc.)
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Finance
Department thesis:degree_department
Edwards School of Business
Grantor
University of Saskatchewan
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Hossein Zavieh, Negar
Advisor dc:contributor.advisor
  • Samarghandi, Hamed
Committee members dc:contributor.committeemember
  • Kabir, Golam
  • Racine, Marie
ORCID person:identifier.orcid

Subjects

dc:subject × 1

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/10388/19327

Chain of custody

source
Harvested from
University of Saskatchewan
Base URL
harvest.usask.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Hossein Zavieh, Negar. A Risk-Informed Framework for Identifying and Warehousing Critical Spare Parts for Primary Water Mains: A Case Study of the City of Saskatoon. Masters thesis, University of Saskatchewan, 2026. https://hdl.handle.net/10388/19327