Back to search

South Dakota State University

Investigating the Feasibility, Procedures, Benefits, and Challenges of Using Mixed Reality in Construction Projects: An Electrical Layout Case Study

Abstract

dc:description.abstract

Innovation and development of technology in the field of visualization have affected the way of designing, presenting, and interacting of the design in the architecture and construction industry. With the invention of the Mixed Reality (MR) device, HoloLens, 2016, many researchers and construction practitioners have marched their research of implementing the MR application in the construction industry. However, there is scarce research on the MR application review, the workflow of using BIM models with the HoloLens, its implementation in the site, and the benefits and challenges of the MR application in the construction site. The gap in the research needs yet to be filled, and this research paper will help to bridge the gap. For this research, the MR application that was available in the market at the time of research were identified through internet research and literature review. The MR applications were installed in two HoloLens and were tested on-site and lab for the construction of the electrical layout. The capabilities of the MR application were studied in the lab and site. The features including scaling, alignment, move, drag, rotate, team collaboration, navigation, and measurement utilities were studied. From the study, the MR application provides several benefits in on-site layout and as-built verification of electrical layout including 3D visualization, less manual work, instruction and demonstration of the construction process, error detection, remote support, quick decision-making, and easy documentation, and efficient progress tracking. Along with the benefits, the MR application has a few challenges while applying it on the site including stud locations, typical rooms, and model drifting. In addition, the limitations of using the MR application were studied. Future research will focus on solving one of the challenges, model drifting, through automatic alignment with survey point references.

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Level thesis:degree_level
Thesis - Open Access
Discipline thesis:degree_discipline
Construction and Operations Management

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Shakya, Samjhana
Contributors dc:contributor
  • Yilei Huang

Subjects

dc:subject × 6

Rights

dc:rights

Identifiers

dc:identifier.*
Repository record dc:identifier
https://openprairie.sdstate.edu/etd/5015

Chain of custody

source
Harvested from
South Dakota State University
Base URL
openprairie.sdstate.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Shakya, Samjhana. Investigating the Feasibility, Procedures, Benefits, and Challenges of Using Mixed Reality in Construction Projects: An Electrical Layout Case Study. Thesis - Open Access thesis, https://openprairie.sdstate.edu/etd/5015