Back to search

San Jose State University

Rehearsal Scheduling Problem

Abstract

dc:description.abstract

Scheduling is a common task that plays a crucial role in many industries such as manufacturing or servicing. In a competitive environment, effective scheduling is one of the key factors to reduce cost and increase productivity. Therefore, scheduling problems have been studied by many researchers over the past thirty years. Rehearsal scheduling problem (RSP) is similar to the popular resource-constrained project scheduling problem (RCPSP); however, it does not have activity precedence constraints and the resources’ availabilities are not fixed during processing time. RSP can be used to schedule rehearsal in theatre industry or to schedule group scheduling when each member has different sets of available time. In this report, three different approaches are proposed to solve RSP including Constraint Programming, Integer Programming, and Schedule Generation Schemes.

Degree

thesis:*
Name thesis:degree_name
Master of Science (MS)
Discipline thesis:degree_discipline
Computer Science

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Bao, Thuan
Contributors dc:contributor
  • Robert Chun
  • Chris Tseng
  • Long Nguyen

Subjects

dc:subject × 5

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
San Jose State University
Base URL
scholarworks.sjsu.edu/do/oai/
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
citation

Bao, Thuan. Rehearsal Scheduling Problem. https://doi.org/10.31979/etd.x972-tbu8