A generalized algorithm to evaluate project completion times and criticality indices for pert networks

Abstract

dc:description.abstract

<p>For stochastic PERT networks the main difficulty in calculating the probability distribution function (dpf) for project completion time is caused by structural and statistical dependence between activities. This dependency also makes it very hard to identify the most critical paths and activities.</p><p>This study presents a method for taking into account dependence between activities and provides a generalized algorithm to evaluate the project completion time and criticality index of each activity and path using a Controlled Interval and Memory (CIM) approach proposed by C.B. Chapman and DF. Cooper (1983) Risk engineering: basic controlled interval and memory models. Journal of the Operational Research Society 34(1), 51-60.</p><p>The procedure allows activity durations to have any continuous or discrete distribution presented in a finite set of ordered pairs. It has been tested using simple activity network models with different statistical and structural dependence between activities.</p><p>The proposed procedure provides an exact pdf for project completion time when the duration times of activities are discrete and approximates the pdf of the project completion time when the duration times of activities are continuous. Approximation is due to: (i) discretizing continuous distributions, (ii) convoluting discrete approximations to continuous distribution.</p><p>The computational experience shows that the criticality indices obtained using the proposed procedure is very close to the exact criticality indices</p><p>obtained using complete enumeration and both methods give the same ranking of criticality indices in most PERT networks. Compared with Monte Carlo simulation, the proposed procedure is comparatively easy to understand and use for simple networks. Moreover, for the same level of precision, Monte Carlo simulation requires much greater computation effort than the proposed procedure. However, Monte Carlo simulation may maintain a comparative advantage for very complex networks, and the ideal approach to networks in general may be a hybrid. (DX77024)</p>

Degree

thesis:*
Name dc:type.qualificationname
Ph.D.
Level dc:type.qualificationlevel
doctoral
Grantor dc:publisher.institution
University of Southampton
Year dc:date.issued
1988

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Soukhakian, Mohammad Ali

Rights

Language dc:language
English, eng

Chain of custody

source
Harvested from
University of Southampton
Base URL
eprints.soton.ac.uk/cgi/oai2
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Soukhakian, Mohammad Ali. A generalized algorithm to evaluate project completion times and criticality indices for pert networks. doctoral thesis, University of Southampton, 1988.