Back to search

University of Southampton

A methodology for selecting the construction team

Abstract

dc:description.abstract

<p><span >Achieving partnering in the public sector is difficult since most projects are one-offs and hence there can be no long term commitment, the option of providing incentives such as pain-gain sharing to contractors and consultants is not possible and contracts need to be awarded by competitive tendering. In a study of a project at Hurst Spit in Hampshire a partnering way of working was achieved with no partnering agreements, no long term commitments and no incentives.</span></p> <p><span >It is proposed that a partnering way of working can be achieved using competitive tendering if a pre-qualification methodology can be developed which will eliminate parties that have not embraced a culture of co-operation.</span></p> <p><span >This thesis describes a methodology that eliminates those companies that attempt to succeed in the pre-qualification stage by second guessing what the client wishes to hear and hence disguising the fact that the culture for co-operative working is not present and prefer to use litigation rather than co-operation. The solution to the problem required a methodology that is specific to project and client, and able to identify and eliminate companies having a culture inappropriate to co-operative working.</span></p> <p><span >Initial trials of the methodology were undertaken with Gosport Borough Council to select consultants and contractors for the construction of a £2m bridge as part of the Millennium scheme for the regeneration of Portsmouth Harbour. The approach was to allow the client to identify all the success criteria that were important to the project. The client was then required to prioritise these criteria using analytical hierarchy process (AHP). Consultants and contractors were then asked to prioritise these same criteria and explain how they would deliver the project on these criteria.</span></p>

Degree

thesis:*
Name dc:type.qualificationname
Ph.D.
Level dc:type.qualificationlevel
doctoral
Grantor dc:publisher.institution
University of Southampton
Year dc:date.issued
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Brown, David Clare

Rights

Language dc:language
English, eng

Chain of custody

source
Harvested from
University of Southampton
Base URL
eprints.soton.ac.uk/cgi/oai2
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Brown, David Clare. A methodology for selecting the construction team. doctoral thesis, University of Southampton, 2003.