University of Southampton
Supply chain readiness for solar PV expansion in Saudi Arabia
Abstract
dc:description.abstractIn its 2030 Vision, Saudi Arabia has a plan to install aroujavascript:void(0);nd 40GW of solar photovoltaic (PV)capacity to be deployed in several projects around the country. This plan also imposes a local content of PV systems components to be delivered through the planned projects. After analysing historical data and trends, it is clear that Saudi Arabia may fall short of reaching the planned local content of the proposed target. To address this a gap identification analysis along with a combination of System Dynamics (SD) and Supply Chain Network Design (SCND) modelling was conducted. The aim is to arrive at robust estimates of the required project delivery, local content and proposed solutions that could both close any projected gap. In addition, the modelling also aims to minimise PV inventory holding costs whilst reducing losses caused by under-utilising the inventory (PV systems) through truck delivery to project sites. Hence, this research provides approaches geared to support Saudi Arabia's local supply chain capabilities and to understand supply constraints. Since the cost of the supply chain represents roughly 25% of manufacturing cost, optimising transportation and storage is justified in terms of projects economies and the final cost of energy supply. Several primary outcomes have been established. The first, under the scenario of business-as usual, the local content production of PV modules is predicted to be short by around 75% of that needed to deliver on the planned projects by 2030. This shortfall will have to be imported from other countries. However, if the new recommendation by the Renewable Energy Projects Development Office REPDO is realised, this shortfall will likely to be reduce to around 34%. This means even with the REPDO plan to increase local PV manufacturing capacity, at least 34% will have to be imported. The second outcome is the realisation of the needed optimal warehouse sites to supply solar systems to the proposed farms, requiring only two supply sites, Riyadh with76 trucks and Jeddah with 62 trucks. This setup provides an optimum option to reduce PV module inventory costs and reduce costs associated with under-utilising the delivery trucks. The other scenarios modelled indicate Saudi Arabia should follow the global trend of PV deployment as opposed to middle east deployment which will allow for the industry to mature gradually. In addition, the best-fitting number of PV module factories should be 8 with 500 MW / year capacity each. This reduces monopolistic activities and still feasible mass production cost. Finally, Saudi Arabia needs to expand the glass, cement, and copper industries to supply the PV module industry. It also should regulate aluminium and silicon sectors so the new demand would not cause price surge. However, the steel and plastic sectors in Saudi Arabia are already mature enough and can supply the solar PV sector with no impact on the price or on the circulated volume.
Degree
thesis:*- Name dc:type.qualificationname
- Ph.D.
- Level dc:type.qualificationlevel
- doctoral
- Grantor dc:publisher.institution
- University of Southampton
- Year dc:date.issued
- 2026
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Alghamdi, Nasser Mohammad A
- Advisors dc:contributor.advisor
-
- Bahaj, Abubakr
- James, Patrick
- ORCID person:identifier.orcid
Rights
- Language dc:language
- English, eng