An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies.

Abstract

dc:description.abstract

At the beginning of this study in 2017, the curse of Flyvbjerg (2017), ‘The Iron Law of Megaprojects Management’ (that they are always delivered ‘over budget, over time and under benefits over and over again’) had already struck Crossrail1 (CRL1) project and there were visible signs of this everywhere. Therefore, the primary objective of this study was to investigate the possible causes of cost and time overrun and poor quality of work on CRL1 project and to identify the potential remedies. Qualitative audio recorded data were collected from a sample of eighty subject matter expert (SME) employees of CRL1 selected using purposive non-random sampling technique. Data was collected through individual and focus group interviews conducted over two phases using in-depth semi-structured open-ended interview questions.<br/>All ethical issues were considered prior and during data collection and reporting. Data was analysed narratively using quotations and thematically using Nvivo software to obtain codes, concepts, categories and themes to produce ‘word tree’, ‘word cloud’ and ‘concept map’ visual representations. The major finding of this research was the revelation that the major causes of cost and time overrun, and poor quality of work on CRL1 project were multiple sourcing strategy, increased number of interfaces created and the resultant problem of uncoordinated and unintegrated designs. The combined remedy (mitigation) against the above three problems affecting CRL1 project proposed by the study were combined use of vertical and horizontal programming procurement strategies. The fourth and fifth major causes revealed were late engagement of systemwide contractor and use of ‘self-certification’ strategy for design and construction work assurance by contractors. The remedies suggested by the study were early engagement of systemwide contractors and increased rate of quality assurance by the Client, respectively. <br/>

Degree

thesis:*
Name dc:type.qualificationname
Ph.D.
Level dc:type.qualificationlevel
doctoral
Grantor dc:publisher.institution
University of Southampton
Year dc:date.issued
2026

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Mudambi, Simbarashe
Advisors dc:contributor.advisor
  • Dacre, Nicholas
  • Kizys, Renatas
ORCID person:identifier.orcid

Rights

Language dc:language
English, eng

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
University of Southampton
Base URL
eprints.soton.ac.uk/cgi/oai2
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Mudambi, Simbarashe. An exploratory case study of risk and opportunity management on CRL1 Project, UK: Investigating the major causes of time and cost overrun, and poor quality of work and possible remedies.. doctoral thesis, University of Southampton, 2026. https://doi.org/10.5258/SOTON/PG/T223