Impact Of Critical Path Method (CPM) Of Scheduling On On-Time Completion Of Transportation Projects

Abstract

dc:description.abstract

This study addresses the effectiveness of Critical Path Method (CPM) scheduling on project delivery. Specifically, the on-time completion of projects with and without a CPM schedule is explored. The paper uses data from 2,097 South Carolina transportation projects let after February 2008 and substantially completed by August 2015. The delay analysis uses the original contract completion date as well as the completion date adjusted by change orders. Chi-Squared tests are used to examine the relationship between CPM scheduled projects and delayed projects, and t-tests are used to compare the mean delay (in days) between CPM scheduled and unscheduled projects. The results of these tests indicate that both the fraction of delayed projects and the mean delay (in days) are larger in projects with CPM schedules. Several conjectures that explain these unexpected results are given. A nationwide survey was conducted to find out the viewpoint on CPM schedules of state Departments of Transportation(DOTs), resident construction engineers and contractors. The survey revealed that most state DOTs use CPM along with Gantt chart for scheduling and perceived complexity and risk are used to select projects for CPM schedules. Resident construction engineers indicated that delay before the start of work on the field do not impact the overall duration of the project. The contractors acknowledge the importance of CPM schedules but they sometimes fail to make most out of CPM schedules. The issues regarding selection criteria, enforcing and skilled person for CPM schedules are addressed in the study and recommendations are provided.

Degree

thesis:*
Name thesis:degree_name
Master of Science
Level thesis:degree_level
Open Access Thesis
Discipline thesis:degree_discipline
Civil and Environmental Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ahmed, Fahim
Contributors dc:contributor
  • Nathan N. Huynh

Subjects

dc:subject × 8

Rights

dc:rights
Statement dc:rights
  • © 2018, Fahim Ahmed

Identifiers

dc:identifier.*
Repository record dc:identifier
https://scholarcommons.sc.edu/etd/4568

Chain of custody

source
Harvested from
University of South Carolina
Base URL
scholarcommons.sc.edu/do/oai/
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Ahmed, Fahim. Impact Of Critical Path Method (CPM) Of Scheduling On On-Time Completion Of Transportation Projects. Open Access Thesis thesis, https://scholarcommons.sc.edu/etd/4568