Six Sigma–DMAIC Approach for Improving Induction Furnace Efficiency and Output at an Iron Foundry Plant

Abstract

dc:description.abstract

The purpose of this project is to demonstrate the application of Six Sigma tools for identifying and improving high overtime labor cost, poor process output and increased production wastes in a local foundry company. This study examines the process variations that lead to high production delays in the Molding Department and poor melt furnace output and increased slag forming in the Melt Departments. The project adopted Six Sigma Define-Measure-Analyze-Improve-Control methodology to improve the processes in both departments to reduce overtime labor cost and high production wastes. After completing the Define-Measure-Analyze phases, the team identified the root causes of high production delays in the Molding Department to be poor scheduling method. Meanwhile, the poor melt furnace output was caused by high runner hang-up delay, sand shakeout issues, material contamination, and equipment calibration issue. In addition, the increased slag formation was caused by raw sand, binder, mold design and sand shakeout issues. These problems were all addressed in the Improve-Control phases and satisfactory results were achieved by the team.

Degree

thesis:*
Name thesis:degree_name
Engineering: M.E.M
Department thesis:degree_department
Mechanical and Manufacturing Engineering
Year dc:date.issued
2016

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Fong, Chen Kwang
Advisors dc:contributor.advisor
  • Dr. Ben R. Baliga
  • Dr. Hiral A. Shah
  • Prof. Balasubramanian Kasi

Subjects

dc:subject × 4

Rights

Identifiers

dc:identifier.*
Dc Identifier Other
mme_etds-53

Chain of custody

source
Harvested from
St. Cloud State University
Base URL
repository.stcloudstate.edu/server/oai/request
Last updated
2026-11-27
Source record
OAI-PMH GetRecord
citation

Fong, Chen Kwang. Six Sigma–DMAIC Approach for Improving Induction Furnace Efficiency and Output at an Iron Foundry Plant. 2016. https://hdl.handle.net/20.500.14755/1794