Texas State University
A Cost Benefit Analysis of State Loop 82 (Aquarena Spring Drive) Grade Separation Project
Abstract
dc:description.abstractThe Loop 82 Rail Road Grade Separation Project is one of the major capital improvement projects that the City of San Marcos has recently taken on. This $38 million project will allow for smoother traffic flow in and out of one of San Marcos’s most traveled routes into the city. The purpose of this paper is to conduct a cost benefit analysis to determine whether or not the project is financially worthwhile. This paper evaluates three major benefits: time savings, vehicle operating savings, and reduction in crashes. The two major costs included the stated project costs and the delay during construction. A twenty year analysis was conducted and discount rates were applied. After considering all of the factors, it was determined that the identified costs outweighed the identified benefits over the evaluation period.
Degree
thesis:*- Name thesis:degree_name
- Masters in Public Administration
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Public Administration
- Department thesis:degree_department
- Political Science
- Grantor
- Texas State University
- Year dc:date.issued
- 2013
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Mays, Dana
- Advisor dc:contributor.advisor
-
- Longoria, Thomas
Subjects
dc:subject × 5Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Dc Identifier Citation
- Mays, D. (2013). A cost benefit analysis of state loop 82 (Aquarena Spring Drive) grade separation project. [Applied Research Project, Texas State University-San Marcos].