The University of Texas at Austin
Addressing material-related issues in industrial construction projects: the state of supplier involvement in project planning and the barriers to information sharing
Abstract
dc:description.abstractMaterial-related issues caused by uncertainty in planning result in schedule delays, cost overruns, and rework in industrial construction projects. The construction industry and researchers have applied CSCM (construction supply chain management) to address material-related issues in industrial construction projects. This allows stakeholders to recognize interdependencies between organizations and activities, so they can handle the issues proactively while minimizing the impact on project performance. Despite the efforts to address the issues, recent industrial construction projects suffer materials delivered differently from plan and request. To contribute to addressing material-related issues in industrial construction projects, this work examined the industry’s state regarding two key enablers for CSCM identified by a systematic literature review: 1) material suppliers’ engagement in project planning and 2) information sharing between organizations. To address the argument over the involvement timing of relatively standardized material suppliers, this work highlighted material supplier perspectives and compared different organizations' opinions. The results show that even bulk, common, and make-to-order material suppliers can resolve common issues in material delivery and create value for industrial construction projects through involvement in the planning phase. Not only suppliers but also all stakeholder types agree with the need for such suppliers’ involvement in project planning. The study respondents considered that multiple issues were commonly caused by the untimely involvement of such suppliers and various benefits could be achieved through early involvement. This finding challenges past studies supporting transactional relationships with such suppliers to pursue a low initial price and preserve supplier selection flexibility. This suggests that other factors than material type should be considered to determine involvement time. Once all stakeholders engage in the project, information sharing is vital to leverage their expertise during project execution. To investigate information sharing between organizations, another key enabler for CSCM, this work employs SCV (supply chain visibility) of industrial construction projects between the phases of detailed design and construction. This study is dedicated to enhancing SCV improvement initiatives by examining its impediments. It specifically addresses three major barriers—technological, organizational, and contractual—and utilizes 10 critical decisions and 79 information needs to inform these decisions. The Delphi method was employed to measure the extent of barriers, achieving a consensus among experts with reduced bias. The findings indicate that industrial projects continue to encounter moderate to significant barriers in informing key decisions. Notably, contractual and organizational issues outweigh technological ones for most information needs. Considering the predominant focus on technological issues in recent research, there is a need to redirect attention to enhance information sharing effectively. This study introduces new insights into the two key enablers of CSCM, proposing ways to optimize CSCM implementation and thus diminish material-related problems in industrial projects.
Degree
thesis:*- Name thesis:degree_name
- Doctor of Engineering
- Discipline thesis:degree_discipline
- Civil Engineering
- Department thesis:degree_department
- Civil, Architectural, and Environmental Engineering
- Grantor
- The University of Texas at Austin
- Year dc:date.issued
- 2024
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Choi, Seogjae
- Advisor dc:contributor.advisor
-
- O''Brien, William J.
- Committee members dc:contributor.committeemember
-
- Leite, Fernanda
- Caldas, Carlos
- Morrice, Douglas
- ORCID person:identifier.orcid
Subjects
dc:subject × 5Rights
- Language dc:language.iso
- English
Identifiers
dc:identifier.*- Identifier URI
- https://hdl.handle.net/2152/128751