Abstract
dc:description.abstractDifferentiating borderline personality disorder from bipolar disorder using the Rorschach Inkblot Test This report studies the routing and scheduling control strategy of a three-class fluid model. A numerical approximation under the [mathematical symbol] scheduling policy is used. Analytical rules are provided to narrow down the optimal strategy under the policy. Numerical results and sensitivity analyses are presented to show how different control strategies perform given different parameters.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Operations Research and Industrial Engineering
- Department thesis:degree_department
- Operations Research and Industrial Engineering
- Grantor
- The University of Texas at Austin
- Year dc:date.issued
- 2013
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Zhu, Meimeizi
- Advisor dc:contributor.advisor
-
- Hasenbein, John J.
Subjects
dc:subject × 1Rights
dc:rights- Statement dc:rights
-
- Copyright is held by the author. Presentation of this material on the Libraries' web site by University Libraries, The University of Texas at Austin was made possible under a limited license grant from the author who has retained all copyrights in the works.
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- https://hdl.handle.net/2152/24082