Back to search

The University of Texas at Austin

Pipe spool pre-fabrication to achieve higher productivity

Abstract

dc:description.abstract

Construction processes are starting to become more mobile and are starting their assembly outside of the job site. Off-site piping is a critical and costly process that goes through design, fabrication, transportation, storage, installation, and inspection. Through the reception of information from executed projects, this thesis analyzes the two main processes of pipe fitting, welding and coupling, and how the increased productivity obtained by factory production changed unit rate values. After the removal of outliers, the significance of the seven pipe diameters analyzed was established by the usage of a Mann Whitney-test with a significance level of .05 to determine which processes successfully improved productivity.

Degree

thesis:*
Name thesis:degree_name
Master of Science in Engineering
Level thesis:degree_level
Masters
Discipline thesis:degree_discipline
Civil Engineering
Department thesis:degree_department
Civil, Architectural, and Environmental Engineering
Grantor
The University of Texas at Austin
Year dc:date.issued
2019

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Silva, Mateus Brisot
Advisor dc:contributor.advisor
  • Caldas, Carlos H.

Subjects

dc:subject × 2

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*

Chain of custody

source
Harvested from
University of Texas
Base URL
repositories.lib.utexas.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
citation

Silva, Mateus Brisot. Pipe spool pre-fabrication to achieve higher productivity. Masters thesis, The University of Texas at Austin, 2019. https://doi.org/10.26153/tsw/1565