A process for determining construction contract duration for highway projects
Abstract
dc:description.abstractThis paper describes a process for estimating the construction contract time for highway projects. The process developed uses the critical path method (CPM) to assess complex, non-repetitive construction items, while at the same time, assessing horizontal, repetitive construction items with the linear scheduling method. This is chiefly done by the identification of strategic sequencing options and critical-path-limited scoping of the model.
Degree
thesis:*- Name thesis:degree_name
- Master of Science in Engineering
- Level thesis:degree_level
- Masters
- Discipline thesis:degree_discipline
- Civil Engineering
- Department thesis:degree_department
- Civil, Architectural, and Environmental Engineering
- Grantor
- University of Texas at Austin
- Year dc:date.issued
- 2004
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Bollig, Christopher Matthew
- Advisor dc:contributor.advisor
-
- O'Connor, James Thomas
Subjects
dc:subject × 3Rights
dc:rights.accessrights- Statement dc:rights.accessrights
-
- Restricted
- Copyright © is held by the author. Presentation of this material on the Libraries' web site by University Libraries, The University of Texas at Austin was made possible under a limited license grant from the author who has retained all copyrights in the works.
- Language dc:language.iso
- eng
Identifiers
dc:identifier.*- Identifier URI
- https://hdl.handle.net/2152/74993