Back to search

The University of Texas at Austin

Parametric cost estimating model for conceptual cost estimating of building construction projects

Abstract

dc:description.abstract

It is well known that decisions at early stages of a construction project have the highest impact on the subsequent project performances. One of the bases for these important decisions is the project’s conceptual cost estimate. It is the first serious effort at attempting to predict the cost of the project. Conceptual estimates are made in the early phases of a project before construction drawings are completed, often before they are begun. The primary function of a conceptual estimate is to tell the owner about the anticipated cost, thus being useful information for the owner in contemplating the project feasibility and further project development. This research identifies building parameters that significantly influence the cost of building construction projects. The research presents methodologies for data collection, database development, data analyses, and parametric cost estimating model development for the purpose of performing building conceptual cost estimate. The data used in the model development and validation were based on the historical project data collected from the Texas Higher Education Coordinating Board (THECB). The data consist of 168 new building projects, built from 1990 to 2000. The technique of multiple regression analysis is used to develop the parametric cost estimating model by establishing the cost estimating relationships between the building parameters and the building construction cost. The purpose of this study is to develop a reasonably accurate and practical method of systematized conceptual cost estimating that can be used by organizations involved in the planning and execution of construction projects, such as THECB and the offices of facilities planning of the major universities in Texas. The concepts and methodologies presented in the study can also be readily applied to other similar organizations.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy
Level thesis:degree_level
Doctoral
Discipline thesis:degree_discipline
Civil Engineering
Department thesis:degree_department
Civil, Architectural, and Environmental Engineering
Grantor
The University of Texas at Austin
Year dc:date.issued
2002

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Phaobunjong, Kan
Advisor dc:contributor.advisor
  • Popescu, Calin

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Copyright is held by the author. Presentation of this material on the Libraries' web site by University Libraries, The University of Texas at Austin was made possible under a limited license grant from the author who has retained all copyrights in the works.
Language dc:language.iso
eng

Identifiers

dc:identifier.*
OCLC
56889695
Identifier
b57185840
Dc Identifier Proquest
3086790

Chain of custody

source
Harvested from
University of Texas
Base URL
repositories.lib.utexas.edu/server/oai/request
Last updated
2026-11-20
Source record
OAI-PMH GetRecord
citation

Phaobunjong, Kan. Parametric cost estimating model for conceptual cost estimating of building construction projects. Doctoral thesis, The University of Texas at Austin, 2002. https://hdl.handle.net/2152/845