Back to search

University of Toronto

Quantitative Models and Methods for Risk-informed Physical Asset Management

Abstract

dc:description.abstract

In the last decade, the management of physical assets has emerged as a crucial business function for companies operating in asset intensive industries. Risk, defined as the likelihood and consequence(s) of undesired events, is an integral part of asset management. In this work, we set out to develop quantitative models and methods to facilitate risk-informed decision-making for the management of physical assets in the natural gas industry. We develop a novel practical approach that can be used in reliability analysis of physical assets. A Bayesian framework is implemented to cohesively integrate objective data with expert opinion and tacit knowledge with the aim toward deriving predictive models for time to failure for physical assets. The methodology presented provides an elegant and powerful way of addressing uncertainty by allowing the analyst to take into consideration all types of available information. To quantitatively analyse potential production losses due to critical asset failures, we develop a physics-based system performance and reliability model for an underground gas storage facility. The model combines a thermo-hydraulic performance model for a gas storage facility consisting of a gathering system, compression system and transmission system with a Monte Carlo simulation of potential disruption events. The model captures interdependence of assets within the system and facilitates quantitative analysis of operational reliability risk for a gas storage system. Additionally, a framework and methodology for decision-making under risk and uncertainty is developed for prioritization of a portfolio of capital investment decisions. The methodology uses quantitative risk measures to prioritize projects based on a combination of risk tolerance criteria, cost-benefit analysis and uncertainty reduction metrics. We use multi-criteria decision analysis methods to integrate subjective decision-maker preferences with objective project performance measures to prioritize potential capital investments. The methodology provides a practical and transparent way of making decisions for the management of physical assets.

Degree

thesis:*
Department dc:contributor.department
Chemical Engineering Applied Chemistry
Year dc:date.issued
2019

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Syed, Zaki
Advisor dc:contributor.advisor
  • Lawryshyn, Yuri

Subjects

dc:subject × 6

Identifiers

dc:identifier.*
Handle dc:identifier.uri
https://hdl.handle.net/1807/97699

Chain of custody

source
Harvested from
University of Toronto
Base URL
utoronto.scholaris.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Syed, Zaki. Quantitative Models and Methods for Risk-informed Physical Asset Management. 2019. https://hdl.handle.net/1807/97699