Back to search

University of British Columbia

Generalized optimization in the British Columbia hydroelectric system

Abstract

dc:description

The purpose of this thesis is to provide a decision analysis tool for BC Hydro medium-term planning engineers to enable them to derive optimal generation schedules to assess the feasibility, advantages and disadvantages of operational alternatives. The development of a six-component system facilitates the analysis of BC Hydro operations. A graphical user interface, preprocessor and spreadsheet were designed to collect and manipulate the raw model data, which is copied with communication protocols from a client workstation to a dedicated server for the Generalized Optimization Model. AMPL and CPLEX are the programming language and off-the-shelf solver that find the optimization problem solution, whose results are copied to the client workstation to be displayed in results software. The first stage of the Generalized Optimization Model is operational and producing feasible results for different scenarios on BC Hydro's Columbia River generating system. Stakeholders determined five suitable alternatives for minimum Revelstoke plant discharge. Each of these studies was completed with different historical plant inflows to simulate the uncertainty of the forecasted inflow. The results showed that the value of BC Hydro resources would decrease if the minimum discharge limit were increased. They also showed that the operation of other BC Hydro plants on the Columbia River and Peace River would change to meet the new minimum flow. The model has demonstrated that the operating flexibility is key to the value of BC Hydro resources; the less constraints on the system, the more operational choices, thus creating more value for stored water. Future development of the Generalized Optimization Model will combine short and long-term studies within the same model. This requires using multiple input data sets to represent the corresponding planning horizons. It will also provide solutions to meet the reliability and capacity requirements of BC Hydro and to sustain the value of the present and future resources for its customers. Modifications will have to be carefully planned to ensure the model's integrity. BC Hydro's residential, commercial and industrial customers will benefit from the results of all of the phases of the Generalized Optimization Model.

Degree

thesis:*
Name thesis:degree_name
Master of Applied Science - MASc
Level thesis:degree_level
master's
Discipline thesis:degree_discipline
Civil Engineering
Grantor dc:publisher
University of British Columbia
Year dc:date
2003

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Fane, Lindsay Alison

Rights

dc:rights
Statement dc:rights
  • For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use.
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/14123

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Fane, Lindsay Alison. Generalized optimization in the British Columbia hydroelectric system. master's thesis, University of British Columbia, 2003. http://hdl.handle.net/2429/14123