Back to search

University of British Columbia

Modelling issues in repetitive construction and an approach to schedule updating

Abstract

dc:description

Planning and control of time and other resources are crucial to the construction of large projects. Yet, current computerized techniques are unable to model the work patterns by which construction personnel plan a project. Furthermore, these methods are not capable of reflecting the day to day changes which must be monitored to control the construction site. The purpose of this thesis-is to promote the usability of computerized planning and scheduling through the development of the heuristic manner by which construction personnel perceive the project. Site studies held in cooperation with Poole Construction Limited and Foundation Company of Canada were performed using a computer scheduling system at the University of British Columbia which contained a prototype model of repetitive work. It provided insight to the process of repetition and rhythm by which projects are planned and to the requirements of the updating process necessary to monitor, and hence control the project. Two models evolved. The definition of the general repetitive structure was formulated to provide construction personnel with a tool by which to model the process of repetition. The definition of an updating process was formulated capable of monitoring daily progress on a construction site. Work performed with these models have shown them to be realistic in their approach to construction management.

Degree

thesis:*
Name thesis:degree_name
Master of Applied Science - MASc
Level thesis:degree_level
master's
Discipline thesis:degree_discipline
Civil Engineering
Grantor dc:publisher
University of British Columbia
Year dc:date
1985

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Williams, Rhys E.

Rights

dc:rights
Statement dc:rights
  • For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use.
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/25145

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Williams, Rhys E.. Modelling issues in repetitive construction and an approach to schedule updating. master's thesis, University of British Columbia, 1985. http://hdl.handle.net/2429/25145