Back to search

University of British Columbia

An adaptive impact monitoring and management strategy for resource development projects

Abstract

dc:description

This thesis advances a conceptual model of adaptive impact monitoring that is designed to overcome many of the criticisms plaguing conventional monitoring strategies. The potential for applying the adaptive model is demonstrated for the Peace River Site C dam proposed for northeastern British Columbia. Environmental impact assessment (EIA) has progressed considerably from its early biophysical orientation to a more comprehensive, interdisciplinary process concerned with the breadth of environmental and socio-economic impacts of development. Impact monitoring, an essential EIA component, has also progressed but in a less innovative fashion. Consequently, conventional monitoring strategies often contain significant deficiencies including insufficient use of past experience, poor monitoring design, and failure to recognize the learning opportunity offered by each project. Adaptive impact monitoring offers significant advantages over traditional strategies. An adaptive strategy is based on a series of impact hypotheses established and tested by an interdisciplinary design team and has two fundamental stages: design and evaluation. A review of the potential environmental impacts of hydroelectric production indicates that the reservoir impact paradigm is beginning to provide a comprehensive basis for assessing development effects. Although the Site C EIA adequately reflects the reservoir impact paradigm, it has three significant weaknesses. First, the potential impacts on downstream ecology and distant downstream users are ill-considered. Second, the potential for increased Site C fisheries parasitism is neglected. Finally, estimates of maximum sustainable yield for the Site C reservoir and Peace River fisheries are unreliable. While opportunities for future impact monitoring were recognized through the Site C panel hearings, they lacked flexibility. The potential impacts on downstream water temperature and fisheries resources are used to illustrate the applicability of the adaptive strategy and the advantages derived from collecting only relevant, statistically credible data to permit testing impact hypotheses in a cost-effective manner. On the basis of these findings, six major policy recommendations are provided for improving the effectiveness of impact monitoring and management for future resource developments.

Degree

thesis:*
Name thesis:degree_name
Master of Science - MSc
Level thesis:degree_level
master's
Discipline thesis:degree_discipline
Interdisciplinary Studies
Grantor dc:publisher
University of British Columbia
Year dc:date
1987

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Dushnisky, Kelvin Paul Michael

Rights

dc:rights
Statement dc:rights
  • For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use.
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/26251

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Dushnisky, Kelvin Paul Michael. An adaptive impact monitoring and management strategy for resource development projects. master's thesis, University of British Columbia, 1987. http://hdl.handle.net/2429/26251