Back to search

University of British Columbia

A proposed information system for concrete construction : a project and activity planning specification

Abstract

dc:description

Current usage of construction information systems is largely confined to Critical Path Method scheduling, accounting systems, and cost control database systems. The function of activity planning is not directly addressed by any of these systems while information from all three systems is required for activity planning. Activity planning is the iterative process of selecting construction elements from the project work breakdown structure, addressing the available details from the plans and specifications, assembling existing experiential information on methods, productivities, and production rates, brainstorming for new and or appropriate existing methods, and deciding on a course of action for each item in the breakdown structure. The focus is on a construction activity planning framework to be utilized by superintendent level personnel. This thesis examines the literature and existing software to identify the technologies that are relevant to detailed activity planning. The concept of utilizing "Planning Models" to address activity planning for repetitious concrete construction is introduced. The "General Activity Planning Model" provides the functions and instructions required for detailed project and activity planning of a generic concrete construction project. "Specific Planning Models" ensue from the general model and two examples are provided to illustrate the process. The first example is of a post-tensioned concrete bridge project. The second is of a cut and cover subway tunnel project. From the two examples, the key planning system attributes of function and flexibility are demonstrated. The functions required include: 1. Project level work breakdown structure and initialization. 2. A two pass system for estimating and planning. 3. Early calculation of target activity durations from milestone constraints. 4. Activity level, continuous crew scheduling, where appropriate, prior to detail design of methods. 5. Operation level input: major resource (formwork quantity) requirements, decision variables, crew size variation to implement duration control, and equipment levelling. The flexibility of the General Planning Model is illustrated by the successful planning of two dissimilar prototype projects from one general model. Specific issues pertaining to each project are structured and solved by example. Computer system issues are discussed. A database system is identified as the software of choice for the construction planning problem. Several commercially available programs are evaluated. Integration of activity planning with other construction specialities is identified in flow chart form.

Degree

thesis:*
Name thesis:degree_name
Master of Applied Science - MASc
Level thesis:degree_level
master's
Discipline thesis:degree_discipline
Civil Engineering
Grantor dc:publisher
University of British Columbia
Year dc:date
1988

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Turnham, James Richard

Rights

dc:rights
Statement dc:rights
  • For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use.
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/28525

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Turnham, James Richard. A proposed information system for concrete construction : a project and activity planning specification. master's thesis, University of British Columbia, 1988. http://hdl.handle.net/2429/28525