Back to search

University of British Columbia

The Pacific Great Eastern Railway and British Columbia

Abstract

dc:description

On February 20, 1912, Premier Richard McBride announced the creation of the Pacific Great Eastern (PGE) railway. The line was to be built from Vancouver, 460 miles northeast to Prince George, passing through Squamish, Lillooet, Williams Lake, and Quesnel. McBride committed government guaranteed bonds of $35,000 per mile or $16,100,000 for construction. The construction contract was awarded, without contest, to Foley, Welch and Stewart (FW&S) with a contractual completion date of July 1, 1915. By November 30, 1915, however, FW&S had exhausted all the bond money but had only completed 164 miles of track between Squamish and Clinton. On February 22, 1918 the BC government assumed control of an insolvent PGE project and immediately became liable for interest charges of more than $900,000 annually plus repayment of the principal. This study examines a wide range of primary documents, including a Legislative Select Committee report, British Columbia statutes, Royal Commissions, financial audits, mortgage documents, reports commissioned by the Legislative Assembly, legal records, political debates and newspapers. Comparative, statistical, deductive and economic methodologies are used to support synthesized analysis establishing the culpability of Premier McBride in the mismanagement of the PGE. Statistical analysis of the private and social values of the railway demonstrate that it was not feasible as a private venture and the amount of necessary investment to realize its social value made it an irresponsible project for McBride to initiate given the limited financial capacities of BC in 1912. This study concludes that the failure and ultimate insolvency of the Pacific Great Eastern Railway by 1918 was the result of mismanagement by Premier McBride in letting contracts which were incentive-incompatible with public interests and acted in violation of sections of the Railway Act; opportunistic contractors who, in the interests of maximizing profit, exploited poorly-crafted contracts and provincial government ineptitude; and economic conditions which, prior to 1912, created optimism about the PGE but after 1912 indicated that the project was not viable.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy - PhD
Level thesis:degree_level
doctoral
Discipline thesis:degree_discipline
Interdisciplinary Studies
Grantor dc:publisher
University of British Columbia
Year dc:date
2012

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Stephenson, Paul John

Rights

dc:rights
Statement dc:rights
  • Attribution-NonCommercial-NoDerivatives 4.0 International
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/41911

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Stephenson, Paul John. The Pacific Great Eastern Railway and British Columbia. doctoral thesis, University of British Columbia, 2012. http://hdl.handle.net/2429/41911