Impacts of internal communication on dynamic schedules in mega highway projects

Abstract

dc:description

Traditionally, construction project management has consisted of three main areas of focus: 1- cost, 2- schedule, and 3- quality. This style of project management primarily developed for new projects has changed during the development and maintenance of transportation infrastructure projects in past years. During this time, these management practices were used for projects that would replace, repair, or expand existent transportation infrastructure. This change in direction has ultimately remodeled current management practices, that focused on the mitigation of risks associated with quality, time and costs. Thus, it is crucial for today’s project management teams to understand and effectively convey the relationships between communication, resources, and organizational hierarchy with scheduling conflicts. The main focus of this study was to observe the relationships between communication, resources, and organizational hierarchy, and how they affect construction schedules. This study is presented as a case study on the Port Mann Highway 1 extension project (PMH1) in British Columbia, Canada. At the time of commission, the PMH1 project was the largest infrastructure project in North America, and was based on a design-build contract. The estimated cost for this project was initially set at 2.46 billion dollars, but with the changes initiated to date, the cost may total more than 3 billion dollars by the time of completion. The two main variables that can affect the construction schedule have been identified as communication and resources. The managers of the general contractors through extensive interview processes have indicated that 77% and 62% of the factors that cause delay to the construction schedule are respectively communication and inexperienced labor force. It was also found that, by moving and replacing medium level managers in the organizational hierarchy, the delays to the construction schedule can be minimized. Based on these findings, a recommended solution has been proposed and validated by a second set of interviews with a second group of senior project managers. It is recommended that a strategized use of computer software be utilized in similar infrastructure projects, which will help management staff minimize costly delays and conflicts caused by miscommunication.

Degree

thesis:*
Name thesis:degree_name
Master of Applied Science - MASc
Level thesis:degree_level
master's
Discipline thesis:degree_discipline
Civil Engineering
Grantor dc:publisher
University of British Columbia
Year dc:date
2014

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Shamloo, Mohammad Amin

Rights

dc:rights
Statement dc:rights
  • Attribution-NonCommercial-NoDerivs 2.5 Canada
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/47098

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Shamloo, Mohammad Amin. Impacts of internal communication on dynamic schedules in mega highway projects. master's thesis, University of British Columbia, 2014. http://hdl.handle.net/2429/47098