Back to search

University of British Columbia

Recognition, modeling and pricing of flexibility in construction of cave mining systems

Abstract

dc:description

Mass caving systems require significant capital expenditure and long-term commitment of resources before production commences. Cave mining projects are confronted with numerous challenges in maintaining their construction schedule expectations. Any delay in construction impacts on the production schedule and, in turn, reduces the project value. In order to increase the expected economic value, the construction schedule needs to be accelerated through strategic flexibilities. It is hypothesized that construction acceleration (crashing) can be achieved by prioritizing the construction schedule or changing the construction strategy. This thesis seeks to expand current knowledge on three interrelated domains for decision making in engineering systems—(i) recognition, (ii) modeling and (iii) pricing of flexibility in cave mining construction. An objective of this study was to provide state-of-the-art project formulation techniques employed in planning that can be used to support decision-making processes in cave mining systems. The first domain requires identifying construction strategies that allow the mine management to implement construction crashing in multiple heading development. Three independent and interrelated flexibilities are considered. The second domain requires development of a methodology suitable for investigating and forecasting through modeling the development and construction rates enabling implementation of flexible strategies. A method capable of modeling the development and construction processes with respect to the advance undercut mining strategy is developed, which integrates the geotechnical and equipment-related uncertainties, using the framework of discrete event simulation. Several models are developed to investigate the impact of implementing these flexibilities on the development and construction rates. The results from the flexible models compared to the benchmark models confirmed that significant construction benefits can be achieved. The third domain requires development of an algorithm suitable for evaluating the cost of implementing a construction crashing option that can accommodate delays. A method that is able to respond to schedule uncertainties in construction projects by incorporating the decision-making strategy of project crashing into the budget, including the cost contingency valuation, is developed using the framework of real options and Monte Carlo simulation from a contractor’s perspective. The results indicated that significant change in costs stems from the variation in risk perceptions and confidence levels.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy - PhD
Level thesis:degree_level
doctoral
Discipline thesis:degree_discipline
Mining Engineering
Grantor dc:publisher
University of British Columbia
Year dc:date
2015

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ahmed, Haitham Magdi

Rights

dc:rights
Statement dc:rights
  • Attribution-NonCommercial-NoDerivs 2.5 Canada
Language dc:language
eng

Identifiers

dc:identifier.*
Handle dc:identifier
http://hdl.handle.net/2429/53938

Chain of custody

source
Harvested from
University of British Columbia
Base URL
circle.library.ubc.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Ahmed, Haitham Magdi. Recognition, modeling and pricing of flexibility in construction of cave mining systems. doctoral thesis, University of British Columbia, 2015. http://hdl.handle.net/2429/53938