University of British Columbia
An analytical framework to estimate downtime and model the recovery of buildings after an earthquake
Abstract
dc:descriptionWhile modern seismic design codes intend to ensure life-safety in extreme earthquakes, policy-makers are moving towards performance objectives stated in terms of acceptable recovery times. This thesis describes a framework to estimate downtime and model the post-earthquake recovery of buildings. Downtime estimates include the time for mobilizing resources after an earthquake and conduct necessary repairs. The proposed framework advances the well-established FEMA P-58 and REDi methodologies by modeling temporal building recovery trajectories to target recovery states such as stability, shelter-in-place, reoccupancy, and functional recovery, as well as by providing probabilistic seismic performance measures that are useful for decision-making. The proposed framework is implemented to evaluate a range of modern 8- to 24-story residential reinforced concrete shear wall buildings located in Seattle, WA. The assessment results indicate that under a functional-level earthquake (roughly equivalent to ground shaking with a return period of 475-years), the average probability across all building heights of not achieving a target shelter-in-place recovery state immediately after the earthquake is 16%, and the probability of downtime to functional recovery exceeding four months is 91.5%. These probabilities exceed the 10% threshold suggested for similar performance measures in the 2015 NEHRP guidelines and FEMA P-2090, respectively. Furthermore, the framework is used to quantify the impact of design strategies on the building’s downtime performance. The results illustrate that certain structural design interventions are effective in ensuring a small probability (<10%) of not achieving the shelter-in-place recovery state immediately after the earthquake but are ineffective in achieving an aggressive four-month target downtime to functional recovery, for which, non-structural enhancements and mitigation measures to impeding factor delays would need to be considered.
Degree
thesis:*- Name thesis:degree_name
- Master of Applied Science - MASc
- Level thesis:degree_level
- master's
- Discipline thesis:degree_discipline
- Civil Engineering
- Grantor dc:publisher
- University of British Columbia
- Year dc:date
- 2021
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Vahanvaty, Taikhum Hussein
- Contributors dc:contributor
-
- Molina Hutt, Carlos
Rights
dc:rights- Statement dc:rights
-
- Attribution-NonCommercial-NoDerivatives 4.0 International
- Language dc:language
- eng
Identifiers
dc:identifier.*- Handle dc:identifier
- http://hdl.handle.net/2429/80026