Back to search

University of Central Florida

A New Six Sigma Implementation Approach For Power Generation Gas Turbines Repair Process Development

Abstract

dc:description.abstract

Power Generation gas turbines used for heavy duty application mainly constitutes three modules; compressor, combustion and turbine. Typically, all these parts are designed by OEM companies for specific number of hours and cycles (also known as starts) before they become dysfunctional. In addition, Gas Turbine (GT) also have intended repair interval depending upon the type of part application and anticipated damages during service operation. Thus, GT parts need inspections and repair (overhaul) after certain operating hours in order to recondition them so that they can be fit for reoperation to produce power. In this dissertation, a unique six sigma DFSS approach for development of GT parts overhaul is presented for total quality improvement. In this dissertation report, a unique six sigma DFSS approach is presented applicable to the development of repair processes for GT parts that can be used during overhauling of the parts. All six sigma phases of the proposed DFSS approach along with repair product development cycle are discussed. Various six sigma tools which yield significant benefits for the process users are also discussed. Importantly, a statistical probabilistic life analysis approach is proposed in order to verify the structural integrity of a repaired GT part. Finally a case study of GT axial compressor diaphragms (stators) to illustrate various phases and six sigma tools usage during each phase of the DFSS approach is discussed. The overall significant benefit of the proposed DFSS approach was to achieve total quality improvement to deliver final GT repair process, faster repair development cycle and end customer satisfaction.

Degree

thesis:*
Grantor dc:publisher
University of Central Florida

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ghunakikar, Somesh
Contributors dc:contributor
  • Elshennawy, Ahmad

Subjects

dc:subject × 2

Rights

Language dc:language
English

Identifiers

dc:identifier.*
Identifier
CFE0006105

Chain of custody

source
Harvested from
Central Florida
Base URL
stars.library.ucf.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Ghunakikar, Somesh. A New Six Sigma Implementation Approach For Power Generation Gas Turbines Repair Process Development. University of Central Florida, https://stars.library.ucf.edu/etd/4968