Back to search

University of Central Florida

Project Scheduling Under Constrained Resources

Abstract

dc:description.abstract

This report examines the widely acceptable Heuristic and Exact procedures for solving the problem of project scheduling and control under constrained resources. Heuristic approaches are more practical, however they depend on the type of the project as well as the resources involved. Exact procedures are illustrated using an Integer Linear Programming formulation of the problem, and also solving it using the Branch and Bound Technique. Impracticality of the exact methods stews from the fact that the computations expand to an unmanageable amount.

Degree

thesis:*
Grantor dc:publisher
University of Central Florida

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Benameur, Mohammed
Contributors dc:contributor
  • Hosni, Yasser A.
  • <p><a href="https://viaf.org/viaf/25713294">Hosni, Yasser A.</a> [VIAF]</p> <p><a href="http://id.loc.gov/authorities/names/no2004109189">Hosni, Yasser A.</a> [LC]</p><p><a href="http://viaf.org/viaf/155956728">University of Central Florida. College of Engineering</a> [VIAF]</p><p><a href="http://id.loc.gov/authorities/names/n82027354.html">University of Central Florida. College of Engineering</a> [LC]</p>

Subjects

dc:subject × 10

Rights

dc:rights
Statement dc:rights
  • Public Domain
Language dc:language
English

Identifiers

dc:identifier.*
Identifier
DP0013287

Chain of custody

source
Harvested from
Central Florida
Base URL
stars.library.ucf.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Benameur, Mohammed. Project Scheduling Under Constrained Resources. University of Central Florida, https://stars.library.ucf.edu/rtd/465