University of Central Florida
MRP, JIT, and OPT: A Comparison on the Production Floor
Abstract
dc:description.abstractIn order to compete in manufacturing, industry realizes it must work more efficiently with its resources. Three manufacturing techniques have been developed to assist industry in this challenge --MRP, JIT, and OPT. This paper compares these three techniques. It concentrates on the factors that affect production after vendor materials are in-house. A brief discussion of some of the implementation difficulties a company may face during the transition to a new philosophy is also addressed. Finally, a case study of a low volume, highly technical military project is evaluated and analyzed.
Degree
thesis:*- Grantor dc:publisher
- University of Central Florida
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Denicole Christopher, Donna M.
- Contributors dc:contributor
-
- Sepulveda, Jose A.
Subjects
dc:subject × 10- Theory of Constraints (OPT)
- Shop-floor scheduling and control
- Implementation and transition challenges
- Low-volume high-technology military production
- Throughput
- lead time
- work-in-process tradeoffs
- Engineering
- Industrial Engineering
- Dissertations; Academic -- Engineering; Engineering -- Dissertations; Academic; Just-in-time systems; Material requirements planning; Production management--Technique; Manufacturing industries--Production control; Production planning--Economic aspects
Rights
dc:rights- Statement dc:rights
-
- Public Domain
- Language dc:language
- English
Identifiers
dc:identifier.*- Identifier
- DP0022058