Abstract
dc:description.abstractThis report mentions some of the difficulties faced by labor estimators when predicting the labor necessary to produce complex weapon systems. Specific attention is focused on estimating the durations and frequencies of testing, troubleshooting, and retesting activities. Emphasis is placed on estimating in a logical manner while using factors based on subjective judgment.
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Stonebraker, Garry K.
- Contributors dc:contributor
-
- Linton, Darrell G.
- <p><a href="https://www.wikidata.org/wiki/Q59273636">Darrell G. Linton (Q59273636)</a></p><p><a href="http://viaf.org/viaf/155956728">University of Central Florida. College of Engineering</a> [VIAF]</p><p><a href="http://id.loc.gov/authorities/names/n82027354.html">University of Central Florida. College of Engineering</a> [LC]</p>
Subjects
dc:subject × 11- Costs
- Industrial
- Manufacturing processes -- Estimates
- Production (Economic theory) -- Estimates
- Production test scheduling
- Troubleshooting time estimation
- Retest-cycle frequency modeling
- Subjective-factor weighting methods
- Weapon-systems test labor
- Engineering
- Labor time--Estimates; Labor--Statistical methods; Labor--Forecasting; Manpower planning--Statistical methods; Armed Forces--Weapons systems--Testing
Rights
dc:rights- Statement dc:rights
-
- Public Domain
- Language dc:language
- English
Identifiers
dc:identifier.*- Identifier
- DP0015918