Back to search

UCL (University College London)

Construction project planning: Improving effectiveness of resources allocation

Abstract

dc:description.abstract

Several studies indicate that the effectiveness of Construction Project Planning (CPP) can be improved by increasing the amount of resources allocated to the task. There are also studies indicating that allocating resources beyond optimum point in planning activities may result in a lack of cost effectiveness because of an increase in overall project costs. Other research concludes that both, too little planning and too much planning are factors that can lead to poor project performance. This research analyses the effectiveness of construction project planning and how resources can be allocated in a cost effective way, in all stages of construction planning. A review of literature is made on construction planning in general and on cost effectiveness aspect. Two samples are used from field research, one sample obtained from interviewing six senior construction planners from large construction firms in UK. Another sample is obtained from eight questionnaire survey from Dubai construction planners, who work for large international Project management consultants. The two samples are compared and analysed and the outcome is discussed. The emphasis is given on how to find strategies to improve the effectiveness of construction planning, while using the resources in a cost effective way, in all stages of construction planning. A general guideline on how to carry out effective construction project planning is provided in a diagram, in concluding chapter. Key Words: Construction Project Planning, Cost, Effectiveness, Resources allocation, Building Contractors.

Degree

thesis:*
Level dc:type.qualificationlevel
Doctoral
Grantor dc:publisher.institution
UCL (University College London)
Year dc:date.issued
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ali, KS

Rights

Language dc:language
en, eng

Identifiers

dc:identifier.*
Repository record dc:identifier.uri
https://discovery.ucl.ac.uk/id/eprint/1568059/

Chain of custody

source
Harvested from
University College London
Base URL
discovery.ucl.ac.uk/cgi/oai2
Last updated
2026-11-26
Source record
OAI-PMH GetRecord
related terms
citation

Ali, KS. Construction project planning: Improving effectiveness of resources allocation. Doctoral thesis, UCL (University College London), 2006. https://discovery.ucl.ac.uk/id/eprint/1568059/