University of Minnesota
Evaluating Post-Restoration Erosion and Streambank Stability Under Various Vegetation and Flow Conditions
Abstract
dc:description.abstractStream restoration is a common and costly practice amongst natural resource managers. While restoration objectives are diverse, erosion mitigation is typically one of several motivations underpinning such projects, as excessive erosion jeopardizes the new channel and has detrimental impacts for water quality. Despite this, the impacts of restoration on streambank stability are poorly understood. Of particular concern is the removal of vegetation during construction combined with a projected trend toward more extreme flow events due to climate change in the Upper Midwest. This study evaluates streambank erosion at six stream restoration projects in and near Duluth, Minnesota, USA. To do this, morphological changes were identified using DEMs created using imagery from Uncrewed Aerial Vehicle (UAV) surveys. These DEMs were examined to identify qualitative changes to channel characteristics. Additionally, each study site was surveyed using a total station. Various metrics of channel geometry were compared to earlier surveys using a linear mixed effects model to assess changes. Lastly, the Bank Stability and Toe Erosion Model (BSTEM) was used to model selected reaches under different flood magnitudes and varying root reinforcement conditions. Factors of safety were evaluated across scenarios to determine the impacts of vegetation and flow on bank stability. These analyses suggested overall stability amongst most restoration projects. Very high percentages of BSTEM scenarios yielded stable results despite multiple erosional events and despite flow increases due to climate change. The total station survey results at most sites showed greater changes in channel metrics in control reaches than treatment reaches. However, two of the study sites showed excessive erosion, with clear changes to morphology observed in the UAV data. East Beaver River in particular showed enough erosion in the treatment reach to influence the results of the statistical analysis. Additionally, high percentages of BSTEM scenarios that suggested instability improved with the addition of vegetation, providing evidence that vegetation removal is problematic from an erosion mitigation perspective. The vegetation results and the case studies of high erosion highlight the necessity of site-specific analysis when selecting, designing, and implementing stream restoration projects.
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Lange, David
Subjects
dc:subject × 11Rights
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Dc Identifier Citation
- Lange, David. (2026). Evaluating Post-Restoration Erosion and Streambank Stability Under Various Vegetation and Flow Conditions. Retrieved from the University Digital Conservancy, https://hdl.handle.net/11299/281037.