University of Nevada, Reno
Feasibility Study of a Cyanide Leach Circuit and Supporting Facilities
Abstract
dc:description.abstractThis senior design project was completed in collaboration with Barrick Gold Corporation and the Department of Chemical and Materials Engineering at the University of Nevada, Reno. A problem statement was given to the team by Barrick representatives, describing a predicted change in the ore body of its Goldstrike mine changes from mainly carbonaceous ore to mainly non-carbonaceous ore near the end of the mine's life. The mine has the ability to build a new processing circuit, which will reduce the cost of processing the non-carbonaceous ore. The criteria for investment in this project involved balancing operating cost savings with capital costs of construction. The project was deemed to be profitable with a net present value of approximately $14.5 million.
Degree
thesis:*- Name thesis:degree_name
- Chemical Engineering
- Level thesis:degree_level
- Honors Thesis
- Department thesis:degree_department
- Chemical and Materials Engineering
- Grantor
- University of Nevada, Reno
- Year dc:date.issued
- 2014
Author and committee
dc:creator, dc:contributor.*- Authors dc:creator
-
- Carl, Sarah
- Chapman, James
- Chinchilla, Miguel
- Crone, Eric
- Donat, Justin
- Hanbury, Rigel
- Jay, Jonathan
- Mentzer, Casey
- Miceli, Joe
- Montiel, Caroline
- Nagel, Tommy
- Pearson, Benjamin
- Advisor dc:contributor.advisor
-
- Fuchs, Alan W.
Rights
dc:rights- Statement dc:rights
-
- In Copyright(All Rights Reserved)
- Author(s)
- Language dc:language.iso
- en_US
Identifiers
dc:identifier.*- Handle dc:identifier.uri
- http://hdl.handle.net/11714/357