Back to search

University of Nevada, Reno

City of Fernley, EWWTP Proposed Improvements

Abstract

dc:description.abstract

The following report describes the proposed redesign of the East Wastewater Treatment Facility (EWWTP) for the City of Fernley, Nevada. The existing facility is designed for a flow of 3.4 MGD, but by the end of the 30-year design period in 2045, the projected maximum flow will rise to 5.45 MGD. The goal of this design is to modify and expand upon the existing treatment plant to allow the City of Fernley to treat the 30-year flow and produce an effluent of sufficient quality to use as irrigation water. Based on the evaluation of existing facilities and typical design parameters for small wastewater treatment facilities, a conventional design including grit removal, biological treatment, nitrification, secondary clarification, filtration, and disinfection is proposed. Design information for the addition of optional primary clarifiers is also included.

Degree

thesis:*
Name thesis:degree_name
Environmental Engineering
Level thesis:degree_level
Honors Thesis
Department thesis:degree_department
Civil and Environmental Engineering
Grantor
University of Nevada, Reno
Year dc:date.issued
2013

Author and committee

dc:creator, dc:contributor.*
Authors dc:creator
  • Kaiser, Ashley
  • Mital, Jenny
Advisor dc:contributor.advisor
  • Marchand, Eric A.

Rights

dc:rights
Statement dc:rights
  • In Copyright(All Rights Reserved)
  • Author(s)
Language dc:language.iso
en_US, English

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/11714/666

Chain of custody

source
Harvested from
University of Nevada - Reno
Base URL
scholarwolf.unr.edu/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Kaiser, Ashley; Mital, Jenny. City of Fernley, EWWTP Proposed Improvements. Honors Thesis thesis, University of Nevada, Reno, 2013. http://hdl.handle.net/11714/666