Abstract
dc:descriptionThe purpose of this study is to examine the three scheduling systems available today as a management tool. The first two systems--Milestone Reporting and Line-of-Balance--are essentially Gantt charts which do not appear to meet the requirements for management control of scheduling. An investigation of PERT is made to see if it will provide additional controls necessary for proper scheduling.
Degree
thesis:*- Grantor dc:publisher
- North Texas State University
- Year dc:date
- 1962
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Ross, William Minor
- Contributors dc:contributor
-
- Self, Stanley Allen
- Littlefield, C. L. (Cleatice Louis)
Subjects
dc:subject × 3Rights
dc:rights- Statement dc:rights
-
- Public
- Copyright
- Copyright is held by the author, unless otherwise noted. All rights reserved.
- Ross, William Minor
- Language dc:language
- English
Identifiers
dc:identifier.*- Identifier
-
call-no: 379 N81 no.2883
local-cont-no: n_02883
untcat: b2488345
ark: ark:/67531/metadc108145