Back to search

University of North Texas

Implementation of Just-in-Time Manufacturing: Perceptions of Behavioral Change During the Transition

Abstract

dc:description

This paper reports a study of the behavioral changes perceived by managerial and non-managerial personnel in a firm transforming from traditional manufacturing methods to the procedures of Just-In-Time manufacturing (JIT).

Degree

thesis:*
Grantor dc:publisher
University of North Texas
Year dc:date
1990

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Metheny, William M. (William Marion)
Contributors dc:contributor
  • Williams, Frederick P.
  • Beyerlein, Michael Martin
  • Watson, Warren E.

Subjects

dc:subject × 5

Rights

dc:rights
Statement dc:rights
  • Public
  • Metheny, William M. (William Marion)
  • Copyright
  • Copyright is held by the author, unless otherwise noted. All rights reserved.
Language dc:language
English

Identifiers

dc:identifier.*
Identifier
local-cont-no: 1002718638-Metheny
call-no: 379 N81d no.3293
oclc: 24804867
untcat: b1470774
ark: ark:/67531/metadc332580

Chain of custody

source
Harvested from
University of North Texas
Base URL
digital.library.unt.edu/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Metheny, William M. (William Marion). Implementation of Just-in-Time Manufacturing: Perceptions of Behavioral Change During the Transition. University of North Texas, 1990. https://digital.library.unt.edu/ark:/67531/metadc332580/