Back to search

University of South Florida

Development of A GIS Based Infrastructure Replacement Prioritization System; A Case Study

Abstract

dc:description

Maintenance, repair, and replacement of transmission mains and distribution system piping is expected to cost approximately $75 billion over the next two decades to ensure that public water systems are capable of providing the United States with safe drinking water. However, there is a significant gap between the funds available and the projected costs of infrastructure replacement or rehabilitation. Infrastructure Management Systems (IMS) have been developed to assist utilities and decision-makers in determining how to allocate resources for infrastructure. This project utilizes theTampa Water Department (TWD) as a case study to develop a tool for prioritizing infrastructure replacement. TWD is responsible for managing over 2,240 miles of pipeline. Building booms in the 1920s and 1950s have inadvertently resulted in a significant need to replace or rehabilitate pipelines due to the aging of the overall water supply infrastructure. To address this problem, TWD is taking the first steps in applying IMS to transmission anddistribution pipelines. Currently, approximately 500 miles of water mains have been slated for replacement or rehabilitation. The TWD has a GIS that has been used to map and integrate information on main breaks, service line breaks, customer complaints and modeled water age. Information on fire hydrant spacing and line flushing dates are also integrated into the GIS. Following development of the GIS based infrastructure replacement prioritization system, approximately 3,000 pipe segments were identified and queries were performed to help develop cost to benefit analyses. The results were used to develop a prioritized list of potential capital projects and incorporate the time value of money and event forecasting. The GIS was also used to develop indicators of the overall infrastructure condition. From this analysis it was possible to develop an approach to categorize projects and identify the resources needed to address high priority problems associated with undersized mains, unlined cast iron mains, asbestos cement mains, and hydraulic looping projects. As water infrastructure rehabilitation and replacement needs increase in the future, the need for adaptable methods to prioritize capital spending will also increase.This study has demonstrated the ability to prioritize long-term and short-term infrastructure projects using a GIS platform in conjunction with databases and spreadsheets.

Degree

thesis:*
Level thesis:degree_level
Thesis
Discipline thesis:degree_discipline
Environmental Engineering
Grantor
University of South Florida
Year dc:date
2006

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Pickard, Brian D.
Contributors dc:contributor
  • Robert P. Carnahan, Ph.D.
  • Audrey D. Levine, Ph.D.
  • Paul Zandbergen, Ph.D.

Subjects

dc:subject × 11

Rights

Language dc:language
EN-US

Identifiers

dc:identifier.*
Repository record dc:identifier
https://digitalcommons.usf.edu/etd/3795

Chain of custody

source
Harvested from
University of South Florida
Base URL
digitalcommons.usf.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
related terms
citation

Pickard, Brian D.. Development of A GIS Based Infrastructure Replacement Prioritization System; A Case Study. Thesis thesis, University of South Florida, 2006. https://digitalcommons.usf.edu/etd/3795