Back to search

University of Victoria (Canada)

The potential contribution of small hydroelectric generation to meeting electrical demand on Vancouver Island.

Abstract

dc:description.abstract

This work focuses on the electrical contribution small hydro generation can make to meeting Vancouver Island's electrical demand, today, and as further development proceeds. A hydrologic assessment of Vancouver Island was undertaken for the period of 1999 to 2005. Eight regional areas were identified that exhibited temporally similar specific discharge runoff patterns, termed flow area curves (FACs). A small hydro generation MATLab model was developed and the FACs used as input to represent available generation flow. The model was used to calculate temporally accurate generation values from 175 small hydro facilities under four development scenarios for the seven year period. Generation results from each scenario were compared to electrical demand on Vancouver Island during that time period to determine the contribution provided by small hydro facilities. Results demonstrated that small hydro facilities are unable to offer dependable capacity, but are capable of meeting a portion of Vancouver Island's electrical demand.

Degree

thesis:*
Level thesis:degree_level
Master of Applied Science M.A.Sc.
Department thesis:degree_department
Department of Mechanical Engineering
Year dc:date.issued
2008

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Schuett, Matthew T.
Advisor dc:contributor.supervisor
  • Wild, Peter

Subjects

dc:subject × 4

Rights

dc:rights
Statement dc:rights
  • Available to the World Wide Web
Language dc:language.iso
en, English

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1828/1242

Chain of custody

source
Harvested from
University of Victoria (Canada)
Base URL
dspace.library.uvic.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Schuett, Matthew T.. The potential contribution of small hydroelectric generation to meeting electrical demand on Vancouver Island.. Master of Applied Science M.A.Sc. thesis, 2008. http://hdl.handle.net/1828/1242