Pilot Scale Application of Partial Nitritation Anammox and Partial Denitrification Anammox Treating Industrial Fertilizer Waste with High Ammonia and Nitrate
Abstract
dc:description.abstractA fertilizer and liquid chemical manufacturer produces wastewater with high concentrations of ammonium (NH4) and nitrate (NO3) with total inorganic nitrogen (TIN) concentrations ranging from 3,000 to 20,000 mg TIN/L. New discharge limits are to be imposed for the discharge of this waste, which motivated a treatability study to incorporate anammox processes for their potential to save resources in designing a process removing over 99% of TIN achieving an effluent TIN of less than 5 mg/L. Since the industrial wastewater is high in both NH4 and NO3 partial nitritation anammox (PNA) and partial denitrification anammox (PdNA) processes were tested. Three phases with different configurations and carbon sources for denitrification were used in this pilot study to establish a proof of concept, and process optimization. Phase I of the study involved two moving bed biofilm reactors (MBBRs) in series, a PNA MBBR followed by a PdNA MBBR, both reactors inoculated with biofilm carriers (WWW-01 Thin, 650 m2/m3) from a full scale side-stream PNA process. Phase I resulted in 89.9% ± 5.6% NH4 removal in the PNA MBBR, and combined with the PdNA MBBR, 92.1%±3.6% of TIN was removed. Although phase I proved the concept of using PNA and PdNA to treat high NH4 and NO3 waste, the PdNA fraction process was susceptible to excessive alkalinity production with variable influent ammonia versus NOx (AvN) in the influent of the PdNA reactor. These challenges led to decreasing anammox activity from free ammonia (FA) exposure that required a reseeding of biofilm carriers to recover. Phase II of the pilot study was configured as a single stage MBBR with intermittent aeration with the goal of optimizing operability and a scalable process for full scale design. Analysis of the industrial wastewater showed variation in the AvN levels, which was a challenge for making the phase I configuration feasible for full scale design. Phase II overcame this issue with intermittent aeration since the aerobic and anoxic fractions could be adjusted as needed. The implementation of this intermittent aeration strategy, increasing aerobic fraction for higher AvN, and vice versa, resulted in 96.3%±1.9% TIN removal from the main reactor in phase II. With the objective of improving final effluent quality and optimizing process efficiency, phase III investigated using glycerol instead of methanol, as well as adding a polishing reactor treating the effluent of the main reactor with full nitrification (FN) and full denitrification (FdN) to obtain a final effluent of less than 5 mg TIN/L. The final loading rate in phase III.B, after methanol was reinstated as the carbon source, was 2.0 g/m2/day of TIN, and a polishing stage effluent quality of less than 5 mg/L TIN was demonstrated, reaching an overall TIN removal efficiency of 99.4%± 0.8% including the polishing step.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Level thesis:degree_level
- masters
- Discipline thesis:degree_discipline
- Civil Engineering
- Department dc:contributor.department
- Civil and Environmental Engineering
- Grantor dc:publisher
- Virginia Tech
- Year dc:date.issued
- 2025
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Wooten, Joseph Sean
- Chairs dc:contributor.committeechair
-
- Pruden, Amy
- Bott, Charles B.
- Committee member dc:contributor.committeemember
-
- Knocke, William R.
Subjects
dc:subject × 2Rights
dc:rights- Statement dc:rights
-
- In Copyright
- Licence dc:rights.uri
- Language dc:language.iso
- en
Identifiers
dc:identifier.*- Dc Identifier Other
- vt_gsexam:43752