Back to search

University of Washington

An equity analysis of the 2014 Seattle Bicycle Master Plan: initial findings and recommended methods improvements

Abstract

dc:description.abstract

This report conducts an equity analysis on the 2014 Seattle Bicycle Master Plan for the purpose of assessing the level of access to bicycle facilities for bicycle dependent populations. Initial findings reveal higher overall levels of access for census block groups in Seattle with relatively high equity scores. However, some clusters of block groups with high equity scores in the northern and southern portions of Seattle were found to have relatively low bicycle facility access. In addition, the average level of access for block groups with higher than the citywide average of youth and older adults was found to be significantly lower than block groups below the citywide average. The methods and results from this analysis are suggested for use in modifying or expanding the bicycle networks to address the inequities identified, and for application in the 2015 Seattle Bicycle Master Plan Implementation Plan. These initial findings should be verified through additional analysis that addresses the limitations of the methods chosen and provides additional context. The limitations of the methods chosen are specifically addressed and recommended improvements given for the additional analysis required and for future equity analyses in other communities.

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ullmer, Michael James
Advisor dc:contributor.advisor
  • Miller, Donald

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Copyright is held by the individual authors.
Language dc:language.iso
en_US

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/1773/34195

Chain of custody

source
Harvested from
University of Washington
Base URL
digital.lib.washington.edu/server/oai/request
Last updated
2026-11-18
Source record
OAI-PMH GetRecord
citation

Ullmer, Michael James. An equity analysis of the 2014 Seattle Bicycle Master Plan: initial findings and recommended methods improvements. 2015. http://hdl.handle.net/1773/34195