Back to search

University of Waterloo

Comprehensive Repetitive Scheduling for Linear and Scattered Infrastructure Projects

Abstract

dc:description.abstract

The majority of civil infrastructure projects involve activities that are repeated across a number of units (e.g., linear highway sections; or scattered multi-bridge repairs). While repetition represents a potential for benefiting from the economy of scale, reality is far different and infrastructure projects continue to exhibit large cost overruns, delays, and disputes. With existing solutions for scheduling repetitive projects unable to adequately cater to infrastructure projects, more efficient tools are needed to support efficient planning and resource management for such projects. To address this need, this research introduces a comprehensive scheduling framework able to address the unique challenges and decision-support requirements for linear and scattered projects. The framework presented improves on the existing integrated critical path method & line-of-balance repetitive scheduling formulation to better achieve synchronized completion of a project’s activities, which reduces both time and cost. The proposed framework also incorporates procedures to resolve resource constraints at both the individual-resource and the crew levels as well. To address the lack of efficient repetitive-scheduling solutions, a new easy-to-use interactive scheduling tool has been developed to combine the benefits of CPM/LOB calculations with the introduced schedule improvements, along with new clearer visualizations of all schedule details (i.e., activities, units, crews etc.). The scheduling improvements proposed in this research and the developed scheduling tool prototype were validated on case studies and proved to greatly facilitate the efficient planning and delivery for repetitive infrastructure projects, which represent an increasing portion of construction business and are most challenging to execute.

Degree

thesis:*
Grantor dc:publisher
University of Waterloo
Year dc:date.issued
2022

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Ojulari, Saidat
Advisor dc:contributor.advisor
  • Hegazi, Tarek

Subjects

dc:subject × 20

Rights

Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/10012/18283

Chain of custody

source
Harvested from
University of Waterloo
Base URL
dspacemainprd01.lib.uwaterloo.ca/server/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Ojulari, Saidat. Comprehensive Repetitive Scheduling for Linear and Scattered Infrastructure Projects. University of Waterloo, 2022. http://hdl.handle.net/10012/18283