Western Kentucky University
Application of Critical Chain Project Management to the Production Part Approval Process
Abstract
dc:description.abstractDaicel Safety Systems Americas, INC has traditionally utilized various methods to manage project completions including the Critical Path Method (CPM). Though these methods have led to successful project completions, they often come with adverse effects. Due to the amount of literature and advancement in the project management discipline, alternative options such as Critical Chain Project Management (CCPM) have gained popularity. CCPM seeks to perfect the CPM approach by recognizing resource constraints and the critical chains dependency on them while safeguarding completion dates with buffers. CCPM offers project managers an option to remove resource inefficiency and stalling while meeting deadlines. The goal of the thesis was to address the validity of CCPM to complete a Production Part Approval Process (PPAP) for a product line addition. The submission was timely due to risk management purposes and manufacturing flexibility. Because of past project history with CPM and the need to advance into a more reliable method, the results of the CCPM approach were heavily analyzed. The project outcome indicated that CCPM offers a viable solution to timely target schedule completions.
Degree
thesis:*- Name thesis:degree_name
- Master of Science
- Discipline thesis:degree_discipline
- School of Engineering and Applied Sciences
Author and committee
dc:creator, dc:contributor.*- Author dc:creator
-
- Podolak, David
- Contributors dc:contributor
-
- Dr. Mark Doggett, Dr. Fatemeh Orooji, and Dr. Asghar Rezasoltani
Subjects
dc:subject × 6Identifiers
dc:identifier.*- Repository record dc:identifier
- https://digitalcommons.wku.edu/theses/3153