Back to search

York University

Back Analysis of Mount Polley Tailing Dam Failure

Abstract

dc:description.abstract

The motivation of this research was to verify the findings of Independent Review Panel for the failed perimeter embankment at Mount Polley Tailings Storage Facility. The finite element analysis conducted in industry standard geotechnical softwares indeed confirmed that the foundation of the perimeter embankment would have failed along the weak GLU layer because of excessive shear deformation in the layer. Additionally, the finite element models also highlighted the importance of choosing correct relative stiffness values for various foundation layers for a realistic development of failure mechanisms for stability analyses done using the Strength Reduction technique. This observation is novel and is of considerable practical significance because designers pay little attention to obtaining stiffness parameters for foundation soils and focus more on obtaining realistic shear-strength parameters. A numerical parametric study conducted to investigate potential ways of preventing failure of the perimeter embankment revealed downstream slope flattening to be the most effective solution.

Degree

thesis:*
Name thesis:degree_name
MSc - Master of Science
Level thesis:degree_level
Master's
Discipline thesis:degree_discipline
Earth & Space Science
Year dc:date.issued
2017

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Arafat, Md. Abdullah Al
Advisor dc:contributor.advisor
  • Sharma, Jltendrapal

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • Author owns copyright, except where explicitly noted. Please contact the author directly with licensing requests.
Language dc:language.iso
en

Identifiers

dc:identifier.*
Handle dc:identifier.uri
http://hdl.handle.net/10315/33522

Chain of custody

source
Harvested from
York University
Base URL
yorkspace.library.yorku.ca/oai/request
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Arafat, Md. Abdullah Al. Back Analysis of Mount Polley Tailing Dam Failure. Master's thesis, 2017. http://hdl.handle.net/10315/33522