[en] ASSESSING INVESTIMENTS OF HYBRID POWER POWER PLANTS IN BRAZIL / [pt] AVALIAÇÃO ECONÔMICO-FINANCEIRA DE USINAS HÍBRIDAS NO BRASIL

DIEGO NASCIMENTO MAIA 18 November 2021 (has links)
[pt] No atual ciclo de expansão do setor elétrico brasileiro está previsto um forte crescimento de fontes renováveis não despacháveis, por exemplo, as fontes eólica e solar fotovoltaica. Neste contexto, o conceito de usinas híbridas tem surgido como uma alternativa para que os riscos dos empreendimentos de geração de energia possam ser melhor gerenciados, além de proporcionar alternativas mais rentáveis no desenvolvimento de projetos desta natureza. A combinação de diferentes tecnologias tem o potencial de propiciar efeitos sinérgicos no desenvolvimento e na operação das usinas e, consequentemente, provocar redução de despesas e custos. O objetivo desta dissertação é apresentar uma abordagem metodológica para avaliar uma usina híbrida composta pelas tecnologias eólica e solar fotovoltaica, considerando dois dos principais fatores de riscos associados, ou seja, a aleatoriedade da geração do empreendimento e do preço da energia no mercado de curto prazo. Para o estudo de caso considerado, a aplicação da metodologia foi capaz de mensurar o ganho sinérgico com o desenvolvimento do arranjo híbrido. As análises de fluxo de caixa foram feitas em base mensal e horária, cujos resultados se mostraram próximos para a maior parte das situações estudadas. Foram realizadas análises de sensibilidade acerca do Montante de Uso do Sistema de Transmissão contratado, as quais indicaram a viabilidade de se contratar 30 por cento a 40 por cento menos do que hoje é obrigatório no setor elétrico brasileiro. Estas análises vieram acompanhadas do dimensionamento do quanto de sua produção o empreendimento deixa de injetar na rede básica em função de diferentes valores do MUST contratado. / [en] In the current expansion cycle of the Brazilian electricity sector, a strong growth of non-dispatchable renewable sources is expected, for example, wind and solar energy. In this context, the concept of hybrid power plants (HPP) has emerged as an alternative so that the risks of energy generation projects can be better managed, in addition to providing more profitable alternatives in the development of projects of this kind. The combination of different technologies has the potential to provide synergistic effects in the development and operation of plants and, consequently, to reduce expenses and costs. The aim of this work is to present a methodological approach to evaluate a HPP composed of wind and solar photovoltaic technologies, considering two of the main associated risk factors, that is, the randomness of the project s generation and the price of energy in the short-term market. For the case study considered, the application of the methodology was able to measure the synergistic gain with the development of the hybrid arrangement. Cash flow analyzes were performed on a monthly and hourly basis, whose results were similar for most of the situations studied. Sensitivity analyzes were carried out on the Amount of Use of the Transmission System (MUST) contracted, which indicated the feasibility of contracting 30 percent to 40 percent less than what is currently mandatory in the Brazilian electricity sector. These analyzes were followed by the dimensioning of how much of its production the project doesn t inject into the basic network due to different values of the MUST contracted.