• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • Tagged with
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] ASSESSMENT OF SPARE TRANSFORMER REQUIREMENTS FOR DISTRIBUTION SUBSTATIONS CONSIDERING MOBILE UNITS / [pt] DIMENSIONAMENTO DA RESERVA TÉCNICA DE TRANSFORMADORES DE SUBESTAÇÃO DE DISTRIBUIÇÃO CONSIDERANDO UNIDADES MÓVEIS

IZABELA MACHADO PUREZA 18 July 2017 (has links)
[pt] O dimensionamento de equipamentos sobressalentes se mostra como importante ferramenta de análise de investimento para o projeto e planejamento da operação e manutenção de qualquer sistema de grande porte. Não sendo diferente no que contempla o sistema de distribuição elétrica no cenário brasileiro. Os sistemas de distribuição, regulados pela Agência Nacional de Energia Elétrica, precisam fornecer energia de forma segura, estável e com índices de defeito extremamente baixos, tornando-se cabíveis punições monetárias no caso de descumprimento das normas estabelecidas. Um dos pontos de maior sensibilidade em um sistema de distribuição são as subestações existentes no mesmo, onde os defeitos impactam um número elevado de consumidores, além de possuir equipamentos de grande custo de aquisição. A redundância em sistemas desse porte poderia reduzir consideravelmente as falhas, mas demandaria um investimento inicial muito elevado. Sendo assim, a existência de estoque estratégico torna-se relevante, visando diminuir a duração das falhas com o menor investimento possível. Os transformadores apresentam grande relevância em uma subestação, sendo possível a análise de estoque de unidades fixas, que atenderiam apenas uma localidade ou região, e o estoque de unidades móveis, que poderiam atender, ainda que em caráter provisório, diferentes regiões atingidas. Esta dissertação apresenta uma metodologia probabilística para a definição da estratégia de dimensionamento dos estoques de equipamentos reservas ao longo do tempo, dando enfoque às unidades móveis, sendo possível avaliar a confiabilidade do sistema, comparar os investimentos e custos operacionais de diferentes cenários. Permite também que sejam consideradas questões importantes, como o envelhecimento dos equipamentos, o aumento da carga com características diferentes para cada unidade a possibilidade de transferência de carga de uma unidade avariada para outra em funcionamento. Essas premissas proporcionam dados mais precisos para análise de investimentos, por considerar as condições individuais dos equipamentos. A ferramenta básica de análise será a simulação Monte Carlo cronológica, de modo a capturar precisamente todas as características do problema em questão. A metodologia acima proposta é aplicada a um grupo de transformadores da classe 138-13,8 kV, 25 MVA, visando demonstrar a capacidade da metodologia de encontrar as soluções condizentes do ponto de vista técnico e econômico. / [en] The sizing of equipment spares is an important investment analysis for the design and planning of the operation and maintenance of any large system. These concepts can also be applied to electric distribution systems of the interconnected Brazilian network. Distribution systems, regulated by the Brazilian Electricity Regulatory Agency, need to supply energy in a secure, stable, and extremely low fault rate, making monetary penalties possible in case of non-compliance with established standards. One of the most sensitive points in a distribution system is its current substations, where failures impact a large number of consumers, besides having relatively high-cost equipment. Redundancy in systems of this type could considerably reduce failures, but would require a very high initial investment. Thus, the need of a strategic inventory becomes relevant, aiming to reduce the duration of the failures with the least possible investment. Transformers are of great importance in an electric power station, whose spare requirements are usually assessed, but would only serve a locality or region, while the stock of mobile units, although on a temporary basis, would serve to different affected regions. This dissertation presents a probabilistic methodology for assessing of spare transformer requirements and the associated inventory acquisition strategy over time, focusing on mobile units. It includes the evaluation of reliability indices and comparison of investment and operational costs for different scenarios. It also allows important issues to be considered, such as equipment aging, load increasing with different characteristics for each unit, and the possibility of load transfers from one faulty unit to another in operation. These assumptions provide more accurate input data for investment analysis, considering the individual conditions of equipment. The basic tool to be used is the chronological Monte Carlo simulation that accurately captures all characteristics of the problem being solved. The proposed methodology is applied to a group of transformers of the class 138-13.8 kV, 25 MVA, aiming to demonstrate the ability of the proposed method to find the appropriate solutions from a technical and economic points of view.

Page generated in 0.0457 seconds