• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

[en] ASSESSMENT OF SPARE TRANSFORMER REQUIREMENTS FOR DISTRIBUTION SUBSTATIONS CONSIDERING MOBILE UNITS / [pt] DIMENSIONAMENTO DA RESERVA TÉCNICA DE TRANSFORMADORES DE SUBESTAÇÃO DE DISTRIBUIÇÃO CONSIDERANDO UNIDADES MÓVEIS

IZABELA MACHADO PUREZA 18 July 2017 (has links)
[pt] O dimensionamento de equipamentos sobressalentes se mostra como importante ferramenta de análise de investimento para o projeto e planejamento da operação e manutenção de qualquer sistema de grande porte. Não sendo diferente no que contempla o sistema de distribuição elétrica no cenário brasileiro. Os sistemas de distribuição, regulados pela Agência Nacional de Energia Elétrica, precisam fornecer energia de forma segura, estável e com índices de defeito extremamente baixos, tornando-se cabíveis punições monetárias no caso de descumprimento das normas estabelecidas. Um dos pontos de maior sensibilidade em um sistema de distribuição são as subestações existentes no mesmo, onde os defeitos impactam um número elevado de consumidores, além de possuir equipamentos de grande custo de aquisição. A redundância em sistemas desse porte poderia reduzir consideravelmente as falhas, mas demandaria um investimento inicial muito elevado. Sendo assim, a existência de estoque estratégico torna-se relevante, visando diminuir a duração das falhas com o menor investimento possível. Os transformadores apresentam grande relevância em uma subestação, sendo possível a análise de estoque de unidades fixas, que atenderiam apenas uma localidade ou região, e o estoque de unidades móveis, que poderiam atender, ainda que em caráter provisório, diferentes regiões atingidas. Esta dissertação apresenta uma metodologia probabilística para a definição da estratégia de dimensionamento dos estoques de equipamentos reservas ao longo do tempo, dando enfoque às unidades móveis, sendo possível avaliar a confiabilidade do sistema, comparar os investimentos e custos operacionais de diferentes cenários. Permite também que sejam consideradas questões importantes, como o envelhecimento dos equipamentos, o aumento da carga com características diferentes para cada unidade a possibilidade de transferência de carga de uma unidade avariada para outra em funcionamento. Essas premissas proporcionam dados mais precisos para análise de investimentos, por considerar as condições individuais dos equipamentos. A ferramenta básica de análise será a simulação Monte Carlo cronológica, de modo a capturar precisamente todas as características do problema em questão. A metodologia acima proposta é aplicada a um grupo de transformadores da classe 138-13,8 kV, 25 MVA, visando demonstrar a capacidade da metodologia de encontrar as soluções condizentes do ponto de vista técnico e econômico. / [en] The sizing of equipment spares is an important investment analysis for the design and planning of the operation and maintenance of any large system. These concepts can also be applied to electric distribution systems of the interconnected Brazilian network. Distribution systems, regulated by the Brazilian Electricity Regulatory Agency, need to supply energy in a secure, stable, and extremely low fault rate, making monetary penalties possible in case of non-compliance with established standards. One of the most sensitive points in a distribution system is its current substations, where failures impact a large number of consumers, besides having relatively high-cost equipment. Redundancy in systems of this type could considerably reduce failures, but would require a very high initial investment. Thus, the need of a strategic inventory becomes relevant, aiming to reduce the duration of the failures with the least possible investment. Transformers are of great importance in an electric power station, whose spare requirements are usually assessed, but would only serve a locality or region, while the stock of mobile units, although on a temporary basis, would serve to different affected regions. This dissertation presents a probabilistic methodology for assessing of spare transformer requirements and the associated inventory acquisition strategy over time, focusing on mobile units. It includes the evaluation of reliability indices and comparison of investment and operational costs for different scenarios. It also allows important issues to be considered, such as equipment aging, load increasing with different characteristics for each unit, and the possibility of load transfers from one faulty unit to another in operation. These assumptions provide more accurate input data for investment analysis, considering the individual conditions of equipment. The basic tool to be used is the chronological Monte Carlo simulation that accurately captures all characteristics of the problem being solved. The proposed methodology is applied to a group of transformers of the class 138-13.8 kV, 25 MVA, aiming to demonstrate the ability of the proposed method to find the appropriate solutions from a technical and economic points of view.
2

[pt] DIMENSIONAMENTO DE ESTOQUES DE TRANSFORMADORES EM SISTEMAS DE POTÊNCIA CONSIDERANDO FALHAS REPARÁVEIS E CATASTRÓFICAS / [en] SIZING OF TRANSFORMER STOCKS IN POWER SYSTEMS CONSIDERING REPAIRABLE AND CATASTROPHIC FAILURES

VENUS LIRIA SILVA MENDES 20 August 2020 (has links)
[pt] Transformadores de subestações de distribuição requerem uma atenção especial pelos altos custos, longos tempos de reposição e por impactarem, quando falham, diretamente na confiabilidade da rede, provocando assim a interrupção de inúmeros usuários. Em geral, as subestações são projetadas com transformadores em paralelo, de forma que a carga pico possa ser atendida ainda que um transformador do grupo esteja avariado. No entanto, esta solução requer investimentos elevados. Uma alternativa consiste no compartilhamento de estoques de transformadores reservas e subestações móveis. O dimensionamento dos estoques deve ser feito com cautela, pois, um grande número de equipamentos pode aumentar desnecessariamente os custos de investimento, e um estoque insuficiente pode diminuir a confiabilidade do sistema e aumentar seus custos operacionais. Esta dissertação apresenta duas metodologias para o dimensionamento do estoque, o método de Markov e a simulação Monte Carlo, os quais são comparados quanto aos seus resultados e características quando aplicados a um mesmo sistema. Ambos os modelos foram utilizados para dimensionar o estoque para falhas do tipo catastróficas e reparáveis, separadamente. O método probabilístico baseado na simulação Monte Carlo foi aplicado a um grupo de transformadores da classe 115 kV e 15 MVA, visando demonstrar a capacidade da metodologia de encontrar soluções condizentes do ponto de vista técnico e econômico. / [en] Substation distribution transformers require special attention for their high costs, long replacement times and for impacting, when they fail, directly on the reliability of the electric network, thus causing the interruption of several costumers. In general, substations are designed with transformers in parallel, so that the peak load can be met even if a transformer in the group is damaged. However, this solution requires high investments. An alternative is to share stocks of spare transformers and mobile substations. Stock sizing should be done with caution, as a large number of equipment can unnecessarily increase investment costs, and insufficient stock can decrease system reliability and increase operating costs. This dissertation presents two methods for stock dimensioning based on Markov modeling and on Monte Carlo simulation, which are compared in terms of their results and characteristics when applied to the same system. Both models were used to scale the stock for catastrophic and repairable failures, separately. The probabilistic method based on the Monte Carlo simulation was applied to a group of 115 kV and 15 MVA class transformers, aiming to demonstrate the method s ability to find solutions that are technically and economically compatible.

Page generated in 0.0529 seconds