• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 143
  • 142
  • 17
  • 15
  • 15
  • 10
  • 9
  • 7
  • 6
  • 6
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 408
  • 408
  • 141
  • 137
  • 113
  • 80
  • 67
  • 67
  • 65
  • 63
  • 61
  • 60
  • 56
  • 50
  • 49
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Optimization of a long-term electricity contract in a large-scale chemical production site /

Chan, Pang. January 2004 (has links)
Thesis (M. Phil.)--Hong Kong University of Science and Technology, 2004. / Includes bibliographical references (leaves 92-95). Also available in electronic version. Access restricted to campus users.
42

Constraints management in a continuous-batch process

Macmillan, Stanley. January 2004 (has links)
Thesis (M. Eng.)(Technology management)--University of Pretoria, 2004. / Includes summary. Includes bibliographical references (Includes bibliographical references (leaves 12-1-12-7).
43

Designing product architecture a systematic method /

Van Wie, Michael James. January 2002 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2002. / Vita. Includes bibliographical references. Available also from UMI Company.
44

Hierarchical integration of production planning and scheduling,

January 1973 (has links)
by Arnoldo C. Hax and Harlan C. Meal. / Bibliography: leaves 20-21.
45

Studie optimalizace plánování výroby / Optimization Study of Production Planning

Markovičová, Radka January 2015 (has links)
The Master’s thesis analyses the production planning in chosen company. Theoretical part focuses on terms, which are necessary to understand to deal with the issue of production planning. The practical part contains an analysis of the current state of production planning in the company, designs and their benefits to improve in this area.
46

Plánování výroby s podporou informačního systému / Production Planning with the Support of Information System

Dvořák, Pavel January 2011 (has links)
This thesis deals with adding planning to the current information system as requirement by the company. The theoretical part describes the methodes of information systems for the production plan. These tools are mostly general and trying to cover the entire spectrum of manufacturing processes. The practical part is devoted to implementing of the produciton planning. The modul planning is incorporated into the current information system.The modul planning has been implementing for efficiency of the systemand faster throughput of the orders the company.
47

Evaluation of probabilistic simulation methods and development of optimization techniques for capacity expansion planning of electric power generation systems.

Tzemos, Spyridon January 1981 (has links)
No description available.
48

Planning horizons for aggregate planning and master production scheduling /

Chung, Chen Hua January 1982 (has links)
No description available.
49

Methods and Techniques Used for Job Shop Scheduling

Yang, Yoo Baik 01 January 1977 (has links) (PDF)
The job shop scheduling problem, in which we must determine the order or sequence for processing a set of jobs through several machines in an optimum manner, has received considerable attention. In this paper a number of the methods and techniques are reviewed and an attempt to categorize them according to their appropriateness for effective use in job shop scheduling has been made. Approaches are classified in two categories: a) analytical techniques and b) graphical methods. Also, it should be noticed that this report does not include all the attempts and trials, especially the heuristic approaches.
50

Gamybos planavimo sistemos / Production planning systems

Šeškevičius, Ramelijus 11 August 2009 (has links)
Įmonėje, kurioje dirbu, buvo pastebėta jog pasitaiko gamybos planavimo klaidų ir nepakankamai išnaudojami turimi ištekliai. Buvo nuspręsta diegti gamybos planavimo sistemą. Buvo rinktasi iš dviejų variantų: įsigyti gamybos planavimo sistemą arba kurtis ją patiems. Buvo iškelti tam tikri reikalavimai, kuriuos turi atitikti ieškoma gamybos planavimo sistema. Taigi, šio darbo tikslas – rasti gamybos planavimo sprendimą, atitinkantį reikalavimus, jį įdiegti ir įvertinti gautus rezultatus. Tikslui pasiekti reikėjo atlikti tokius uždavinius: - Išanalizuoti rinkoje esančias sistemas - Radus tinkamą ją įdiegti įmonėje. Tinkamos neradus susikurti ją patiems. - Palyginti gamybos rodiklius, kuriuos gali įtakoti gamybos planavimo sistema prieš ir po sistemos diegimo. Darbe yra apžvelgtos gamybos planavimo sistemos, jų veikimo principai. Kadangi rinkoje nebuvo rasta visus iškeltus reikalavimus atitinkanti sistema, buvo nuspręsta ją kurtis patiems. Sistema buvo sukurta ir sėkmingai įdiegta. Taip pat buvo išanalizuoti įmonės veiklos rodikliai, kuriuos gali įtakoti gamybos planavimo sistema, prieš ir po gamybos planavimo sistemos diegimo. Įdiegus gamybos planavimo sistemą visiškai išnyko planavimo klaidos, pradėta efektyviau naudoti turimus išteklius, bei sumažintas darbuotojų skaičius planavimo skyriuje nuo 3 iki 1 darbuotojo. / In my company sometimes appear some mistakes in production planning. Some resources were used in not effective way. There was a decision to install production planning system. There were two opportunities: to buy or to create production planning system. There were some requirements for that system. So the goal was to find production planning system which satisfy all requirements. To realize the goal need to do: - To analyze production planning systems in the market - If found correct system then install it, if not, create production planning system - To compare production indexes before installing production planning system and after that In this article there is comparison of production planning systems in the market. There was not found correct system in the market so decision was to create our own production planning system. The system was created, tested and installed successfully. After installation of production planning system production mistakes disappear, was started more effective usage of production resources and in planning department left only one worker instead of three.

Page generated in 0.0822 seconds