• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 205
  • 54
  • 34
  • 4
  • 4
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 369
  • 369
  • 63
  • 62
  • 52
  • 50
  • 49
  • 48
  • 47
  • 46
  • 43
  • 42
  • 40
  • 35
  • 34
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Product scheduling for the makespan problem with sequence dependent setup times

Cura, Boris. January 1993 (has links)
Thesis (M.S.)--Ohio University, August, 1993. / Title from PDF t.p.
92

Multi-objective optimization of manufacturing processes design /

El-Sayed, Jacqueline Johnson, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 77-85). Also available on the Internet.
93

A method for solving the minimization of the maximum number of open stacks problem within a cutting process

Poliquit, Elmer S. January 2008 (has links) (PDF)
Thesis (M.S.)--University of North Carolina Wilmington, 2008. / Title from PDF title page (viewed September 24, 2008) Includes bibliographical references (p. 46-47)
94

Multi-objective optimization of manufacturing processes design

El-Sayed, Jacqueline Johnson, January 1997 (has links)
Thesis (Ph. D.)--University of Missouri-Columbia, 1997. / Typescript. Vita. Includes bibliographical references (leaves 77-85). Also available on the Internet.
95

Heuristic scheduling of low acuity patients at the emergency department

Khadndekar, Shashank. January 2007 (has links)
Thesis (M.S.)--State University of New York at Binghamton, Department of Systems Science and Industrial Engineering, 2007. / Includes bibliographical references (leaves 121-125).
96

Stochastic resource constrained project scheduling with stochastic task insertions problems

Archer, Sandra. January 2008 (has links)
Thesis (Ph.D.)--University of Central Florida, 2008. / Advisers: Robert L. Armacost, Julia Pet-Armacost. Includes bibliographical references (p. 405-416).
97

Highway earthwork and pavement production rates for construction time estimation

Kuo, Yao-chen, O'Connor, James Thomas, January 2004 (has links) (PDF)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
98

Cell loading and scheduling in a shoe manufacturing company /

Subramanian, Ananthanarayanan K. January 2004 (has links)
Thesis (M.S.)--Ohio University, November, 2004. / Includes bibliographical references (p. 126-130)
99

Production scheduling for virtual cellular manufacturing systems /

Wong, Yat-sing. January 1999 (has links)
Thesis (Ph. D.)--University of Hong Kong, 1999. / Includes bibliographical references.
100

Improvements to construction delay analysis techniques /

Popescu-Kohler, Anamaria Iuliana, January 1998 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 1998. / Vita. Includes bibliographical references (leaves 165-167). Available also in a digital version from Dissertation Abstracts.

Page generated in 0.0526 seconds