Spelling suggestions: "subject:"[een] PRODUCTION SCHEDULING"" "subject:"[enn] PRODUCTION SCHEDULING""
71 |
A study on cyclic hoist scheduling problems /Jiang, Yun. January 2003 (has links)
Thesis (Ph. D.)--Hong Kong University of Science and Technology, 2003. / Includes bibliographical references (leaves 135-138). Also available in electronic version. Access restricted to campus users.
|
72 |
An immunological approach to rolling horizon order pickup scheduling for AS/RSsLau, Shuk-kwan., 劉淑君. January 2010 (has links)
published_or_final_version / Industrial and Manufacturing Systems Engineering / Doctoral / Doctor of Philosophy
|
73 |
A comparative study of assembly job shop scheduling using simulation, heuristics and meta-heuristicsLü, Haili., 吕海利. January 2011 (has links)
published_or_final_version / Industrial and Manufacturing Systems Engineering / Doctoral / Doctor of Philosophy
|
74 |
Highway bridge construction production rates for time estimationHuh, Youngki, 1969- 02 August 2011 (has links)
Not available / text
|
75 |
Simulation of industrial bulk cargo ocean shippingPreston, Edward Graham, 1937- January 1966 (has links)
No description available.
|
76 |
An analysis of the problem of creating a scheduling process: the case study of a speech and hearing clinicMayers, Russell Stevens January 1972 (has links)
No description available.
|
77 |
A heuristic for the assignment problem and related bounds /Lai, Cheong Wai. January 1981 (has links)
No description available.
|
78 |
An integrated model of computer-aided cost estimating/scheduling in construction managementAppau, Kwaku Addae 12 1900 (has links)
No description available.
|
79 |
Crew scheduling, cutting stock, and column generation : Solving huge integer programsVance, Pamela H. 08 1900 (has links)
No description available.
|
80 |
Throughout efficiency analysis of the mobot-carousel storage systemMardix, Ido 05 1900 (has links)
No description available.
|
Page generated in 0.0352 seconds